My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/10/1998 SCHOOL COMMITTEE Minutes
>
8/10/1998 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2018 5:02:26 PM
Creation date
7/3/2018 4:00:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE SCHOOL COMMITTEE - REGULAR MEETING -- AUGUST 10, 1998 <br /> FAGS <br /> 7.2 Food Service Update - 'There was no report this evening, <br /> 7.3 Enrollments - lir-. DeMoura updated the Committee on <br /> the latest round of new registrations which include an <br /> additional 12 since last month's printout. It was noted that <br /> perhaps Grade 9 reflected an additional 20 students in <br /> Ma h ee High School. Ur. I eMoura will double-check those <br /> figures as well as the Cape Cod Tech figures. This issue will <br /> be revisited during the September 2nd meeting. <br /> 7.4 Facilities R ort - Included in the packet was the <br /> monthly report from School Facilities Supervisor Don Cook <br /> who updated the Committee on the following: <br /> Coombs School: <br /> • HVAC improvements are underway. Work within the <br /> classrooms will be completed fust with the common areas <br /> and exterior to follow. Scheduled completion date i <br /> September 4th on schedule). <br /> • Carpeting replacement for the library and front i <br /> scheduled for dune 29-July 3 (completed). <br /> • Cafeterias blinds sent out for cleaning and repairs <br /> (completed). <br /> • Canvas railing covers sent out for cleaning (completed). <br /> New lines will be painted on the gymnasium floor <br /> (completed). <br /> • Summer cleaning is on schedule. <br /> • Baseball infield needs more work between first and third <br /> bases. Two 10-wheel truck loads of mix were added to first <br /> and third baselines and hone plate area this past spring <br /> by the maintenance staff. <br /> Ouashnet Schools: <br /> • Front entry scheduled for the removal/replacement during <br /> Tune 2 -July 1 (completed), <br /> • Cafeteria blinds and curtains sent out for cleaning and <br /> repairs (completed). <br /> • Cafeteria and kitchen are scheduled for painting by <br /> maintenance staff (completed) <br /> Front entry at QVS to be painted by maintenance staff. <br /> Summer cleaning is on schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.