My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/26/1995 DESIGN REVIEW COMMITTEE Minutes
>
4/26/1995 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 5:02:33 PM
Creation date
7/9/2018 2:41:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F <br /> Design Review Agenda April 2 ,, 1995 and minutes <br /> 1. Louis Giampietro,office building at the corner of Great Dock Road North and Old Barnstable Road <br /> Perlin anary discussion with layout and building plans. T.F. suggestcd a 1-8 pitch on <br /> the <br /> roof, submit colors,veneer on roof: Need a landscape plan with lighting,plantings, <br /> dumpster with enclosure. Mr. Giampietro will come back next meeting. <br /> 2. Donut slop Cape Drive and Route 2 , dupster location v fence in the right location in the <br /> corner,colors are -1 saltine with white trim and dark architectural shingle. Stege Antol.to check <br /> landscape plan. <br /> . Attaquin Acres Nursery Sign, 1T, 130, Sign and colon approved with hanging boards for seasonal <br /> changes, <br /> . Clark Balboni&Gildea Sign at Sound Reality building at the rotary, sign much too big, the <br /> existing sign was restricted to the low height, Tony wants the full board to review. <br /> . Beer Crossing funding E 1 LTT 28, preliminary discussion, Building and location appeared 0. <br /> K. needed <br /> landscaping, lighting, parking,,lighting etc. <br /> . Harwich Block,Echo Road and RT. 130, Ir, wickstrom has a legal use for indoor storage and s des, <br /> but would have to go before design review for any outdoor storage. The signs exceeds 20 feet,was <br /> changed without design review. The sign must be subrtted to design review and if he stores outside that <br /> layout-must also be submitted. The sign and the o requires Board Gf Appeals. <br /> dr2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.