Laserfiche WebLink
H. FEDERAL COMMUNICATIONS COMMISSION: <br /> GENERAL REQUIREMENTS - <br /> + FEDERAL COMMUNICATIONS COMMISSION - RULES AND REGULATIONS PART 17: CONSTRUCTION, MARKING AND LIGHTING OF ANTENNA STRUCTURES. <br /> 1. GENERAL L STRUCTURAL STEEL PAINTING COUNCIL: <br /> 1.1. SUMMARY OF WORK • SSPC-SP-1-63: SPECIFICATION FOR PAINTING STEEL STRUCTURES. <br /> A. THE WORK MAY CONSIST OF, BUT NOT BE LIMITED TO, THE INSTALLATION OF A GENERATOR BUILDING, EQUIPMENT BUILDING, J. MOTOROLA R56 STANDARDS AND GUIDELINES FOR COMMUNICATIONS SITES (LATEST REVISION). <br /> ANTENNAS AND LINES, FUEL TANKS, GROUNDING, ELECTRICAL WORK, ETC., ASSOCIATED WITH THE MOTOROLA EQUIPMENT AS INDICATED <br /> ON DRAWINGS AND AS SPECIFIED HEREIN. CONTRACTOR SHALL SUPPLY ALL PERMANENT MATERIALS/EQUIPMENT REQUIRED AND ALL K. MOTOROLA'S CIVIL WORKS BID SPECIFICATIONS <br /> LABOR, EQUIPMENT, TOOLS, UTILITIES, MINOR HARDWARE/MATERIALS, TRANSPORTATION AND FACILITIES NECESSARY FOR PROPER <br /> EXECUTION AND COMPLETION OF SERVICES AND INSTALL WORK, WHETHER TEMPORARY OR PERMANENT. CONTRACTOR SHALL BE L. NATIONAL FIRE PROTECTION ASSOCIATION: <br /> OBLIGATED TO PERFORM ALL THE WORK OUTLINED IN THESE DRAWINGS IN ACCORDANCE WITH THE CONTRACT AGREEMENT, FEDERAL . NFPA 1 - FIRE PREVENTION CODE <br /> REGULATIONS, STATE REQUIREMENTS, LOCAL CODES, COMMERCIAL/INDUSTRY STANDARDS, DETAILED SCOPE OF WORK AND THE + NFPA 70 - NATIONAL ELECTRICAL CODE <br /> DOCUMENTS IDENTIFIED BELOW. IN CASE OF A CONFLICT BETWEEN THE ABOVE LISTED DOCUMENTS REGARDING STANDARDS OF WORK, • NFPA 101 - LIFE SAFETY CODE <br /> THE MORE STRINGENT CRITERIA SHALL APPLY. ANY ADDITIONAL COSTS OR DELAYS RESULTING FROM CORRECTION OF THE WORK TO • NFPA 111 - STANDARD ON STORED ELECTRICAL ENERGY, EMERGENCY AND STANDBY POWER SYSTEMS <br /> COMPLY WITH THE ABOVE REQUIREMENT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. * NFPA 780 - STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEMS <br /> M. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION: <br /> 1.2. SITE VISIT *OSHA 1926 <br /> OSHA DIRECTIVES CPL 2-1.29 - INTERIM INSPECTION PROCEDURES DURING COMMUNICATION TOWER CONSTRUCTION ACTIVITIES. <br /> CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE ITSELF WITH THE SCOPE OF WORK REQUIRED PER THE DRAWINGS AND ALL LOCAL 1 4 NOTICE TO PROCEED <br /> CONDITIONS AND LAWS AND REGULATIONS THAT MAY IN ANY MANNER AFFECT THE PRICE, PROGRESS AND PERFORMANCE OF WORK, <br /> INCLUDING ANY COSTS ASSOCIATED WITH IT. THE CONTRACTOR ALSO VERIFY THAT THE PROJECT CAN BE CONSTRUCTED IN WHEN THE SITE IS READY FOR INSTALLATION, MOTOROLA SHALL ISSUE A NOTICE TO PROCEED TO THE CONTRACTOR. UPON RECEIPT OF THE NOTICE OF PROCEED, THE <br /> ACCORDANCE WITH THE CONTRACT DOCUMENTS AND NOTIFY THE MOTOROLA REPRESENTATIVE OF ANY DISCREPANCIES OR CONTRACTOR SHALL SUBMIT TO MOTOROLA A SCHEDULE REFLECTING THE WORK PLAN. THE CONTRACTOR SHALL ADVISE THE MOTOROLA REPRESENTATIVE IMMEDIATELY OF <br /> INTERFERENCES WHICH AFFECT THE WORK OF THIS CONTRACT. <br /> ANY SCHEDULE CHANGES. THE CONTRACTOR SHALL ADJUST HIS WORK, AS REQUIRED, TO COORDINATE WITH THE MOTOROLA INSTALLATION TEAM IF THE SCHEDULES <br /> 1.3. STANDARDS AND CODES OVERLAP. <br /> THE FOLLOWING DOCUMENTS (LATEST REVISION) SHALL BE CONSIDERED TO BE SPECIFICATION AND ARE INCORPORATED HEREIN BY 1.5. MOTOROLA REPRESENTATIVE <br /> REFERENCE. IN THE EVENT OF CONFLICT BETWEEN THE REQUIREMENTS OF THIS SPECIFICATION AND THE REQUIREMENTS OF THE MOTOROLA SHALL DESIGNATE A REPRESENTATIVE. THIS PERSON IS THE ONLY CONTACT POINT AUTHORIZED TO MAKE ANY CHANGES TO THE CONTRACT PROVISIONS OR THE <br /> REFERENCED DOCUMENTS, THE STRICTER SPECIFICATION SHALL GOVERN. WHERE PROVISIONS OF THE CODES AND STANDARDS ARE IN <br /> CONFLICT WITH THE BUILDING CODE IN FORCE FOR THIS PROJECT, THE BUILDING CODE SHALL GOVERN. PIANS AND SPECIFICATIONS. ANY CHANGES MADE BY THE CONTRACTOR ARE AT THE CONTRACTORS RESPONSIBILITY AND RISK. <br /> A. AMERICAN CONCRETE INSTITUTE: 1.6. CONTRACTORS FIELD REPRESENTATIVE <br /> • ACI 301 - "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS". CONTRACTOR SHALL ASSIGN A FIELD REPRESENTATIVE WHO IS FAMILIAR WITH THESE SPECIFICATIONS AND WILL REPRESENT THE CONTRACTOR AND HAVE THE AUTHORITY TO <br /> • ACI 305 "HOT WEATHER CONCRETING". ACT FOR THE CONTRACTOR AND SUPERVISE ALL CONSTRUCTION ACTIVITIES. THE FIELD REPRESENTATIVE SHALL BE AVAILABLE WHEN CONSTRUCTION ACTIVITIES BEGIN. THE <br /> • ACI 306 "COLD WEATHER CONCRETING". FIELD REPRESENTATIVE SHALL BE THE PRIMARY POINT OF CONTACT FOR MOTOROLA DURING THE CONSTRUCTION PHASE OF THE WORK. <br /> • ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE." <br /> • ACI 614 "RECOMMENDED PRACTICE FOR MEASURING, MIXING AND PLACING CONCRETE". 1.7. PROJECT MEETINGS <br /> • ACI 311 "RECOMMENDED PRACTICE FOR CONCRETE INSPECTION". <br /> • ACI 315 "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES". THE CONTRACTOR SHALL CONDUCT THE INITIAL (PRE-CONSTRUCTION) MEETING (INCLUDING ALL SUB-CONTRACTORS) WITH THE MOTOROLA REPRESENTATIVE WITHIN TWO <br /> • ACI 613 "RECOMMENDED PRACTICE FOR SELECTING PROPORTIONS FOR CONCRETE". WEEKS AFTER AWARD OF THE CONTRACT. SUBSEQUENTLY, THE CONTRACTOR SHALL PROVIDE PROGRESS SCHEDULE UPDATES TO MOTOROLA ON A WEEKLY BASIS. <br /> B. AMERICAN NATIONAL STANDARDS INSTITUTE: 1.8. MATERIALS <br /> + ANSI 2359 REQUIREMENTS FOR PERSONAL FALL ARREST SYSTEMS, SUBSYSTEMS AND COMPONENTS <br /> • ANSI Z87.1 OCCUPATIONAL AND EDUCATIONAL EYE AND FACE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AS REQUIRED FOR COMPLETE SYSTEMS INCLUDING: ALL PARTS OBVIOUSLY OR REASONABLY INCIDENTAL TO A <br /> • ANSI Z89.1 PROTECTIVE HEADWEAR FOR INDUSTRIAL WORKERS -REQUIREMENTS COMPLETE INSTALLATION, WHETHER SPECIFICALLY INDICATED OR NOT. ALL SYSTEMS SHALL BE COMPLETELY ASSEMBLED, TESTED, ADJUSTED AND DEMONSTRATED TO BE <br /> • ANSI/IEEE C95.1 SAFETY LEVELS WITH RESPECT TO HUMAN EXPOSURE TO RADIO FREQUENCY ENERGY READY FOR OPERATION PRIOR TO MOTOROLA'S ACCEPTANCE. <br /> • ANSI/TLA/EIA STANDARD 222: STRUCTURAL STANDARDS FOR STEEL ANTENNA TOWERS AND—ANTENNA SUPPORTING STRUCTURES. - - - - - A - -"- -i- - ECT <br /> _ --- - - -- - -- -- MATERIALS ANDWORKMANSHIPSHALL BE THE BEST OF THEIR RESPECTIVE KINDS (AS DEFINED BY INDUSTRY STANDARDS), FREE OF DEFECTS AND ALL MATERIALS SHALL 8E <br /> C. AMERICAN INSTITUTE OF STEEL CONSTRUCTION" NEW AND UNUSED IN ALL CASES, UNLESS OTHERWISE SPECIFIED. WHERE THE NAME OF A CONCERN OR MANUFACTURER IS MENTIONED ON DRAWINGS OR IN <br /> AISC MANUAL OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION: LATEST EDITION SPECIFICATIONS IN REFERENCE TO A REQUIRED SERVICE OR PRODUCT, AND-NO QUALIFICATIONS OR SPECIFICATION OF SUCH IS INCLUDED, THEN THE MATERIAL <br /> SPECIFICATIONS, DETAILS OF MANUFACTURE, FINISH, ETC., SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD PRACTICE, DIRECTION OR SPECIFICATIONS. THE <br /> D. AMERICAN SOCIETY FOR TESTING AND MATERIALS: CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO THE MANUFACTURERS / VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE <br /> + ASTM A615 - "SPECIFICATION FOR DEFORMED AND PLAIN BILLET STEEL BARS FOR CONCRETE REINFORCEMENT". LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. <br /> • ASTM C94-80 - "SPECIFICATION FOR READY-MIX CONCRETE". <br /> + ASTM C39-77 - "SPECIFICATION FOR TEST FOR COMPREHENSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMEN". 1.9. VERIFICATION OF EXISTING CONDITIONS <br /> * ASTM C33 - "SPECIFICATION FOR CONCRETE AGGREGATES". BEFORE STARTING ANY OPERATION, THE CONTRACTOR SHALL EXAMINE EXISTING WORK, OR WORK PERFORMED BY OTHERS, TO WHICH ITS WORK IS TO ADJOIN OR BE <br /> + ASTM C150 - "SPECIFICATION FOR PORTLAND CEMENT'. APPLIED, AND SHALL REPORT TO MOTOROLA PROJECT MANAGER ANY CONDITIONS THAT WILL PREVENT SATISFACTORY ACCOMPLISHMENT OF HIS WORK. PRIOR TO <br /> ' ASTM C172 - "SAMPLING FRESH CONCRETE". COMMENCING ANY EXCAVATION OR GRADING, THE CONTRACTOR SHALL SATISFY HIMSELF AS TO THE ACCURACY OF ALL SURVEY DATA AS INDICATED IN THE PLANS AND <br /> • ASTM C143 - "SLUMP OF PORTLAND CEMENT CONCRETE". SPECIFICATIONS AND/OR AS PROVIDED BY MOTOROLA. SHOULD THE CONTRACTOR DISCOVER ANY INACCURACIES, ERRORS, OR OMISSIONS IN THE SURVEY DATA, HE SHALL <br /> • ASTM D698-91 - "TEST METHOD FOR LABORATORY COMPACTION CHARACTERISTICS OF SOILS USING STANDARD EFFORT". IMMEDIATELY NOTIFY THE MOTOROLA REPRESENTATIVE IN ORDER THAT PROPER ADJUSTMENTS CAN BE ANTICIPATED AND ORDERED. FAILURE TO NOTIFY THE MOTOROLA <br /> ASTM D1556-64 - "DENSITY OF SOIL IN PLACE BY THE H SAND-CONE METHOD", REPRESENTATIVE OF DEFICIENCIES, ERRORS OR FAULTS PRIOR TO COMMENCEMENT OF WORK SHALL CONSTITUTE ACCEPTANCE THEREOF AND WAIVER OF ANY CLAIMS OF <br /> + ASTM D1557 - "TEST FOR MOISTURE-UNIT WEIGHT RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES USING 10-LB. HAMMER UNSUITABILITY, ERRORS, OMISSIONS OR INACCURACIES. <br /> AND 18-IN. DROP". (PROCEDURE C) <br /> + ASTM D2487 - "STANDARD CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES (UNIFIED SOIL CLASSIFICATION SYSTEM)" THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, EASEMENTS, ETC. DURING CONSTRUCTION. UPON COMPLETION OF WORK, THE <br /> • ASTM D2922 - "DENSITY OF SOIL AND SOIL AGGREGATE IN PLACE BY NUCLEAR METHODS SHALLOW DEPTH". CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE PROPERTY. THE CONTRACTOR SHALL ALSO BE <br /> • ASTM D2940 - "STANDARD SPECIFICATION FOR GRADED AGGREGATE MATERIAL FOR BASES OR SUB-BASES FOR HIGHWAYS OR RESPONSIBLE FOR PRESERVING ALL ESTABLISHED SURVEY CONTROL POINTS. IF THE CONTRACTOR OR ANY OF HIS SUB-CONTRACTORS MOVE OR DESTROY ANY SURVEY <br /> CONTROL POINTS, THE COST INCURRED BY THE LAND OWNER OR MOTOROLA TO RE-ESTABLISH THEM WILL BE BORNE BY THE CONTRACTOR. <br /> AIRPORTS" <br /> E. AMERICAN WELDING SOCIETY: <br /> • AWS D12.1 - "RECOMMENDED PRACTICES FOR WELDING REINFORCING STEEL, METAL INSERTS AND CONNECTIONS IN REINFORCED <br /> CONCRETE CONSTRUCTION". <br /> F. CONCRETE REINFORCING STEEL INSTITUTE: <br /> • "MANUAL OF STANDARD PRACTICE" <br /> G. FEDERAL AVIATION ADMINISTRATION: <br /> • DEPARTMENT OF TRANSPORTATION - FEDERAL AVIATION ADMINISTRATION ADVISORY CIRCULAR, AC 70/7460-1G: OBSTRUCTION <br /> MARKING AND LIGHTING. <br /> • DEPARTMENT OF TRANSPORTATION - FEDERAL AVIATION ADMINISTRATION ADVISORY CIRCULAR, 150-5345-43, FAA/DOD SPECIFICATION <br /> L-856: HIGH INTENSITY OBSTRUCTION LIGHTING SYSTEMS. <br /> i n f i n i g v GENERAL NOTES (� I <br /> ang I neo EI n g V-/ 1 <br /> see, eyln9 <br /> YL'S ew.m MN nJ MOTOROLA MASHPEE <br /> RU.100 n IS A-ENRON OF UW FOR Ntt FERDDN. <br /> NNhftOAmmz - - - 154 INDUSTRIAL DRIVE °xu:SS INET ARE Acnx°UNDER THE DREcWN <br /> ° /z>/iz ISSUED FOR ZONING MGB RGB GIW Axj mxww mnd y�7;,,t'QJyYSSL° e 3a�1.. MASHPEE, MA 02649 ROV nr A ucENsm oR°FEssl°Nu EN°INcrn.To k*ER <br /> No D,TE REVISIONS e. ERR OPD 127-403 <br />