Laserfiche WebLink
`1E S July 3 1919 9 7 4 BOARD OF HEALTH <br /> 39 Ppponesset Island Road - Mr. Evans relayed, "I inspected the site and found the <br /> leach trench clogged.' "Sewage was backing up into the house." "There are engineered <br /> plans on file." ` Soils will be removed and a new leach pit installed." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification' form. <br /> 3 victoria Circle - Mr. Evans relayed, "I inspected the site and found the leach pit <br /> filled." "There is an engineered plan onfile." <br /> Board members forwarded their signature's to the "'Emergency Repair <br /> Certification" form. <br /> 38 Nehoid n Road - fir, Evans relayed, "I inspected the site and found the leach pit <br /> full." "The existing system consists of a 1000 gallon tank with a leach pit,' <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> APP INT NMNT: Paul Avereft- Building Expansion <br /> Mr. Paul Averett was in attendance for this scheduled appointment. <br /> Mr. Evans relayed, "In November of 1996 lair. Averett's system went into <br /> failure." "we certified the system in failure and an emergency re " <br /> parr was done. "Mr. , <br /> verett signed an affidavit which agreed to no increase in habitable space." " e would <br /> now like to increase his living space. <br /> Mr. McQuaid stated, "what the repair involved was they removed the existing <br /> cesspool, installed a loo gallon task and Put in three 500 gallon dry wells with ' of <br /> stone." "The actual leaching capacity is 463 gallons per day which meets the <br /> requirements for a four bedroom house." "In the past we haven't had a detailed repair <br /> plan.' "we have the "As Built" which has the exact location of the three dry eels. I <br /> believe in this instance the Board should be lenient to this family because when they did <br /> the repair they oversized the system." "I don"t think 1t is necessary for him to go to the <br /> expense of hiring an engineer to verify this leaching capacity.' <br /> Mr. Crain motioned to grant the increase in habitable space, I Ir. Doherty <br /> seconded, all agreed. <br />