My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/21/1997 BOARD OF HEALTH Minutes
>
8/21/1997 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:00:48 PM
Creation date
7/13/2018 2:35:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> I <br /> to the non-compliance by lir. DiMaggio then we will be let off the hook, as long as, Mr. <br /> DiMaggio completes the stump pile." <br /> NBN-LJTES August 21, 1997 6 BOARD OF HEALTH <br /> Mr. Ball directed the Agent to follow-up to determine who is responsible if D.E.P. <br /> fines us. <br /> Mr. McQuaid commented, "I did contact Roger Alcott from Weston & Sampson <br /> who relayed he has not heard back from Town Counsel.' <br /> 10.) Pert extension request, 11 Jeep Place - 1r. Doherty motioned to grant a 90 day <br /> pert test extension from the date of expiration, l r. Cram seconded, all agreed. <br /> 11.E variance re nest 7 fake Avenue - Mr. McQuaid relayed, "The existing on-site <br /> well could be reheated which would maintain 150' from the proposed leaching facility." <br /> "This is an existing house." `The applicant would like to replace the existing pits with <br /> Title v system." <br /> fir. Doherty motioned to grant a 9' local variance from the proposed leaching <br /> facility to the existing on-site well, Mr. Cram seconded, all agreed. <br /> 12. Emergency failure certifications, 48.1 route 130, 12 P luot road, 65 Pimlico Pond <br /> Road and 264 Pimlico Pond Road <br /> i <br /> 481 Route 130 - Mr. Evans relayed, "I inspected the site and found the leach pit full." <br /> i <br /> Board members forwarded their signature's to the "Emergency Repair <br /> C r ificaton" form.. <br /> 12 P qu t Road - Mr. Evans relayed, 'I inspected the site and found the leach pit filled <br /> to overflowing." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> 65 Pimlico Pond toad - Mr. Evans relayed, "I inspected the site and found the leach Pit <br /> overflowing onto the ground surface." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.