My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/18/1997 BOARD OF HEALTH Minutes
>
9/18/1997 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:15:57 PM
Creation date
7/13/2018 2:36:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
09/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Cram motioned to grant a 3' local variance from the proposed on-site <br /> leaching facility to the proposed'on-site well with the stipulation the applicant sign the <br /> water supply affidavit, Mr. Ball seconded. <br /> M]NUTES September 1 , 1997 4 BOARDF HEALTH <br /> 20 Quail Hollow Roach - Mr. McQuaid relayed, "This is another instance where clue to <br /> the moratorium they have proposed a well in order to get their building permit." "The <br /> variances are a 3' local variance from the proposed well to the abutting leaching facility <br /> ##3 Shorewood Drive), a 45' Deal variance from the proposed well to the abutting <br /> leaching facility (#16 Quail Hollow Road) and a 17' local variance from the proposed <br /> on-site leaching facility to the proposed on-site well.' <br /> Mr. Cram motioned to grant the variances as stated by Mr. McQuaid with the <br /> stipulation the owner sign the water supply affidavit, Mr. Ball seconded. <br /> 28 Fairway Lane - Mr. McQuaid relayed, `The applicant is requesting a 1.5' front lot_ <br /> line variance." <br /> Mr. Cram motioned to grant the 1.5 front lot line variance as requested, 11r. Ball <br /> seconded. <br /> 9. Exner egl�. Failure Certification, 98 Cape Drive e - Mr. Evans relayed, "I <br /> inspected the site and found the septic tank overflowing and sewage was backing-up into <br /> the basement." <br /> i <br /> Board members forwarded their signature's to the "Emergency repair <br /> �ertif ication' form. <br /> Eery Failure Certification- 5 0 Edgewater Drive <br /> Mr. Evans relayed, "I inspected the site and found the leach pit overflowing onto <br /> the ground surface." <br /> Cranbegy contamination E.D.B. Falmouth Bogs (jNew release <br /> ,Acknowledged. <br />
The URL can be used to link to this page
Your browser does not support the video tag.