Laserfiche WebLink
Mr. Doherty responded, "It doesn't go deep enough." `This 1s'a perc test.' "It's <br /> preliminary test to see if there aregoing to be any problems." "Typically, if a pert test <br /> NIMUTES December 4. 1997 3 BOARD OF HEALTH <br /> doesn't reveal any problems you won't have any." "There is a problem, the groundwater <br /> is to high." <br /> Ms. Stevens stated, `The problem is Mashpee doesn't allow mounding systems,"' <br /> "That lave makes a lot of lots in 1lshpee unbuildble." <br /> Mr. McQuaid stated, "It doesn't make a lot f lots d i le." "I think_on of <br /> the reasons why we adopted this policy was; there are two sections to Title v, one you <br /> have ' of naturally occurring pervious soil and then there is another part of Title v which <br /> states you have to have ' below the bottom of the leaching facility and groundwater." <br /> "We combined those two parts of Title v." "We have been taken to court on this <br /> regulation and we have not lost." <br /> Ms. Stevens stated, "I arra requesting the Board grant a variance and allover a <br /> mounded system." <br /> Mr. Doherty responded, "I'm not inclined to grant that." "You have not given m <br /> any compelli <br />