Laserfiche WebLink
i <br /> I <br /> � 4' <br /> NffNU E S January 1996 3 BOARD OF hTALTH <br /> Board members forwarded their signatures to the "Emergency Repair <br /> erticationf' form. <br /> 26 RAINBOW JANE - fir. Evans relayed, "Mr. McQuaid inspected the site and found <br /> the leach pit full." "'He directed the installer to install a d-box and to add a second pit.' <br /> Board members forwarded their signatures to the '`Emergency Repair <br /> Certification" form. <br /> 8.) Variance requests=.._.51 Bayshore give; 29 Sheffield Place, 21 Taffrail �Ayand 2 <br /> Spoondrift�a <br /> 1 BAYSHORF, DQE - Mr. Evans relayed, "Due to Conservation Commission <br /> requirements the owner is requesting a 10' sideline variance." <br /> Mr. Ball motioned to grant a 10' sideline variance, Mr. Cram seconded, <br /> 29 SHEFFIELD PLACE - Mr. Evans relayed, "At the last regularly scheduled meeting <br /> plans were submitted however, the engineer failed to defineate exact distances from <br /> abutting wells and leaching acilities." "The Board denied the variance rebef Without <br /> prejudice."' "The engineer has now submitted a cover letter indicating the variances <br /> requested." "This is a preapproved subdivision." "The owner is requesting a I I' local <br /> variance from the proposed on-site leaching facility to the proposed on-site well." <br /> Mr. Ball motioned to grant a I F local variance from the proposed on-site leas ng <br /> facility to the proposed on-site well, Mr. Cram seconded. <br /> 1 TAFFRAIUL W. - Mr. Evans relayed, "The Conservation Commission could not <br /> very the wetland delineation due to the snow cover and noted that the engineer's <br /> delineation did not conform to thee- standards. > "�i:r. McQuaid did recommend -the Board <br /> require D.E.P. review.51 <br /> Mr. Ball stated, "The wetlands delineation was approved previously.150 "If the <br /> minimum is ' then I recon rend approval for the installation of the Clivus -Mltr rn <br /> system." <br />