My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/18/1996 BOARD OF HEALTH Minutes
>
4/18/1996 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:09:28 PM
Creation date
7/13/2018 2:44:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
04/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f ' <br /> MrNUTES April 18, 1996ARD of HEALTH <br /> original conversation with there indicated that this would not be allowed if these four lots <br /> were owned by wlowbend Corporation because these four lots would then be considered <br /> condominium lots and all condominium lots must be connected to the private treatment <br /> dant." "From an engineering point it is easier to install Title V systems then to redesign <br /> the gravity feed to the treatment plant although it is not engineering wise impossible to tie <br /> these lots into the treatment plant.' <br /> Mr. Doherty questioned fir. Pasha, "what's the ownership status of the lots T9 <br /> Mr. Paska responded, "Two of the four are owned by Wi lowbend." `", herr <br /> willorbend was purchased there were a number of lots that were aetuahy built on or <br /> deeded out."' "The problem with those lots was when the subdivision was purchased out <br /> of bankruptcy those lots had already gone to individual owners." "There is a State law <br /> about who can and can't tie into the sewer system." "They don't recognize a <br /> homeowner's association as having enough legal lien rights for that pose that would <br /> alloy condonfiniums at this point.'? "The problem is a low pressure forced main was <br /> placed in the ground to service the lots." "That line was sized based on the total flow of <br /> those homes." <br /> Mr. dein stated, "The low pressure system was installed by the original <br /> developer.'' "what we have is a " and "' low pressure sewer which is supposed to <br /> collect from individual grinder pumps at each of the units throughout the complex." "That <br /> was the original intent:"' "If we were to connect into that now with four houses it <br /> wouldn't go anywhere her it would stay thereforever." "Tbe love pressure system has been <br /> checked, it r lit work as a low pressure system,it certainly wouldn't work as a forced <br /> maim system."" `when we came in and started redesigning this we decided to go more <br /> with the conventional gravity and surer forced main system to the wastewater treatment <br /> plant."' "The area of willowbend Drive and Gullane Road would flow under Bill build-out <br /> conditions with a sewer by gravity back to the pump station but it would have to be sized <br /> in order to handle all of this and may in fact, handle across the street when that gets built." <br /> "Ify ou install it now for four houses you would have such slog flow conditions that it Just <br /> would not have enough velocity to keep it from clogging u .3019 <br /> Mr. Ball questioned, "How many houses would it tale to keep the system <br /> functioning properly." <br /> Mr. Klein responded, "A lot depends on how we end up sizing it." Gi lot depends <br /> on what the final development is." "It also depends on what D.E.P. approves."' <br />
The URL can be used to link to this page
Your browser does not support the video tag.