My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/22/1996 BOARD OF HEALTH Minutes
>
8/22/1996 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 5:01:17 PM
Creation date
7/13/2018 3:00:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
08/22/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti w <br /> NHNUTES August 22, 1996 10 BOARD OF BEALTH <br /> approxunately$3,500-00." "We will not have to comply with the order of non-compliance <br /> if we sip a consent agreement to tie-in by January 1, 1999 and it's accepted by D.B.P.. <br /> "This is verbal only." <br /> Mr. Cram stated, "We have nothing in writing from D. . .." '`I really have a <br /> roblem on trying to base my decision on a verbal comment with nothing in writing to <br /> substantiate it." "We have until the evening of town meeting to withdraw the article." <br /> Mr. McQuaid stated, `gone ofthe problems is the town has 60 days to respond to <br /> the notice ofnon-comm fiance.," "That means contracting with an engineering firm to come <br /> up with a desk top study.'' <br /> Mr. Crayon commented "The Board of Selectmen and the Board ofHealth could <br /> submit the article jointly." <br /> MT. McQuaid stated, "I will forward a memo to the Executive Secretary stating if <br /> he wishes to pursue the January 1, 199 9 consent agreement go for it."" <br /> Board members agreed. <br /> School Wastewater Treatment Plant and water Supply <br /> Wastewater Treatment Plant - McQuaid relayed, "We received a letter from Weston <br /> Sampson which' discusses payment for the operation and maintenance ofthe treatment <br /> plant." "'The `will not be paying for the electric bill. The monthly payment will be <br /> reduced appropriately. <br /> Acknowledged. <br /> Water Supply - Mr. McQuaid stated, "The plumbing inspector did not want to flush the <br /> system with chlorine.'? "Inspeaking with D, .P. and the County it was agreed to flush the <br /> stem for a 72 hourperiod."" "Everything was find until yesterday when the treatment <br /> plant overflowed into the holding tanks."' "They were going to release the water in the <br /> tanks into the Mashpee River however, we decided to take a v.o.c, sample first. The <br /> results are that in one of the tanks P.C.E. was at 8.2 p.p.b. and in the final tank it was at <br /> 13 . .b,." "The known drinking water standard limit is 5 p.p.b.." "we're above in both <br /> in <br /> but we're not talking about g water we're talking about effluent. I tried to get <br /> touch with the 1 . ,P. but I couldn't reach a contact erson. "I called Weston <br />' Sampsonand ave them the results and the are going to continue trying o get in touch <br /> darn � <br /> i 1 . .P.." `we're the hopes that they w avow u to just discharge the tanks into <br /> wt <br />
The URL can be used to link to this page
Your browser does not support the video tag.