Laserfiche WebLink
L .: MASHPEE FIRE DEPARTMENT <br /> MASHPEE, MASS. 02649 TEL 477-D 411 <br /> I <br /> ~ , March 26, 1980 <br /> ! i <br /> Mr. Glen R. Merithew <br /> Director of Design <br /> Anderson - Nichols <br /> 150 Causeway Street <br /> Boston, Ma 02114 <br /> Re: Building Discrepancies <br /> Dear Mr. Merithew, <br /> The following is a list of discrepancies that I <br /> mentioned to you on your visit today. <br /> Interior <br /> Rug - Visible widening of seams, <br /> shrinkage, and poor adhesion <br /> throughout the building. <br /> Thermostats <br /> Not functioning properly. <br /> Base Board Heat <br /> Chief' s Office - Heating element <br /> only covers 508 of exterior <br /> wall. <br /> Wall Board <br /> Screws are backing out through the <br /> wall board on all interior walls. <br /> Light Switch <br /> Signal Room - One light switch only. <br /> Placement of switch is at the <br /> front door entrance. No switch <br /> provided near console area. <br /> Kitchen Cabinets it <br /> Warping - all cabinet doors and drawers. <br /> Console <br /> Generator Status Lights - not functional. <br /> I <br /> i <br />