Laserfiche WebLink
i <br /> ' To: Terry, Hanson and Murphy <br /> Fr.40 <br /> oma <br /> D :: u y 6, 1984 <br /> Re Meed. 'in Boston w-3-th State and Federal Agencies concerning' <br /> Poppones set Bay Dredging on July 13, 1984* <br /> 'A list of those present is attached. <br /> + A copy �Michael shay's consultant hired by the PBA) 1 Iter is <br /> attached,, <br /> Purpose of Meeting: Requirements for dredging <br /> 'own has n , definite plan <br /> Coordinate 'ith - all agencies <br /> Stabilization of beach <br /> Al resen re ad e . tbtoRhefqWn j cerned about all <br /> the � rl in�lt� n s� �ilizHoe <br /> Concerns of agencies : These- are the regulatory- agencies, not the . funding <br /> sources. <br /> MEPA: if 10,000 yds is removed, then NEPA becomes involved.ed. TherFe .- <br /> is the material being deposited, is it capatible material and 's the <br /> project harmful to the environment. <br /> Note : f all agencies reviewapplications �� i�thin the same time <br /> frame--the process could 'tale six months to one year. <br /> DEQE - r it concern is resources. A Notice of <br /> Intent'' would have to be - filed with the Mashpee and Barnstable <br /> Conservation Commissions. Requires an 'corder of Conditions" . They <br /> are not to - concern ed with depositing the channel material on the, <br /> i barrier beach, they are concerned how the upland materials will be <br /> deposited and where. Cannot be at the landfill because of pollutants <br /> can be near saltwater. <br /> DEQ E <br /> *P g g This gal was the tough one. Materials <br /> Water/Pollution Cont3ro1 . <br /> wi 11 need -an .'analysis. P ro D ect 'will need periodic reviews. Chemical <br /> cal <br /> pollutants (material being deposited) will need to be watcid. <br /> Corps f Enq i nee rs : Under Chapter 91 (Regs- are being <br /> reprised) <br /> 1a igatlon/maintenance, extent of project, type of proj4zct, <br /> tide elevations, disposal tatics , beach nurish n nt program. Can issue <br /> e i is for fire to ton years.. (This i where the periodic reviews <br /> p . <br /> come in. Looking for a total project* once a registered engineer <br /> plan is accepted, project can be done by phases and. financing. <br /> Funds <br /> Eng. Plan Agencies' Review <br /> Phase Project Publicity <br /> Voters � 1 of 2 pages <br />