My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/4/1991 BOARD OF SELECTMEN Minutes
>
11/4/1991 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2018 5:19:52 PM
Creation date
7/27/2018 2:12:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
11/04/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> BOARD OF SELECTMEN <br /> MINUTE <br /> MOLD Y, NOVEMBER , 1991 <br /> Present : Selectman .. Jacobson, Selectman Hanson, Selectman Lawrence, <br /> Selectman Caffyn IV <br /> Executive Secretary Kevin J, Harrington <br /> 'down Counsel Joseph J. Reardon <br /> Guests : George Costa , Judy Mills, Jim Vaccaro, Paul Finn, <br /> Denise Sullivan, Catherine Conroy, Paul Ott , Neel <br /> Zei er, Richard Halpern, Elizabeth Pettit Greg Taylor <br /> The Meeting was Called to Order by Chairman Jacobson at : 00 p.m. <br /> PUBLIC DISCUSSION:, <br /> Popponesset Island Bridge Discussion: <br /> Mr. Ben 'Gordon- representing the Bright Coves Committee of <br /> Peninsula Council asked the Board to fund for emergency repairs <br /> to the Popponesset Island bridge. <br /> The storm of last week created a major wash out on the north <br /> side of the bridge stated Mr. Gordon. The prolene is serious . I <br /> it is not corrected,. half the width 'of the road will not be there <br /> and the road will be impassible. <br /> The Committee is currently working on long teat solutions for <br /> the bridge reports Mr. Gordon. Bonito Contractors have given ars <br /> estimate for the emergency repairs to the bridge, The price of <br /> $5500 <br /> f- <br /> 0o includes installation of pressure treated lumber, use of existing <br /> pilings , addition of stone riprap and backfill with coarse gravel . <br /> The plan has been worked on by Mike Grotske. <br /> Mr, Harrington reported he has visited the site with DPW Director <br /> Greg Taylor, The condition descried by Mr. Gordon is accurate. There <br /> is a substantial amount of erosion and a large hole in the middle of <br /> the road. <br /> 'Iowa Counsel was contacted and signage and barrels have been <br /> permitted and aro in place to warn residents of the condition. Two <br /> steel plates were placed over the hold today to provide some relief . <br /> The situation has to be addressed states Mr . Harrington. <br /> Last year there was a similar prolene with the bridge reports <br /> Mr . Harrington, The Town made the necessary repairs and was reimbursed . <br /> There is a need for the Town to expend the money to resolve the im- <br /> mediate prob-lem. Mr. Harrington reports he is pleased there is a long <br /> term solution to the bridge. <br /> The solution would be temporary and not long term states Mr . <br /> Taylor since we are utilizing existing timber. There are two areas <br /> where the pavement is broken from the read reports Mr . Taylor. ' one is <br /> on the edge of the bulkhead and the other is in the center of the road . <br /> These are two very serious problems . There is also a third problem <br /> on the other side of the bullhead where it is holding -up the soil . <br /> Mr. Gordon noted the problem has stemmed from a water leak that <br /> was repaired by the Nater District . This accentuated the problem with <br /> the excavation that was done. He asks what the contribution and liab- <br /> ility is of the District# <br />
The URL can be used to link to this page
Your browser does not support the video tag.