My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/22/1993 BOARD OF SELECTMEN Minutes
>
4/22/1993 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2023 4:07:11 PM
Creation date
7/30/2018 10:49:37 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
04/22/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />0 <br />BOARD OF SELECTMEN t Pate <br />MINUTES <br />MONDAYt AP1IL 2 19 3 <br />Site Review Committee re:RequestFor Proposal: <br />Advertisement will be made for two creeks in the central <br />Register informed Nis, Ahl ren. The requested PFP return date is <br />May 20, 1.993 . <br />The Site review committee will propose two sites for the <br />future high school indicated Ms, Ahl ren . As recommended by the <br />Educational Facilities Needs Committee, the potential sites are <br />located between Meeting House Board Noi y Hole Road/Route 13 and <br />in the area of Route 11Old.Barrnstble Road. <br />The scope of services as addressed in the 1FP include; a <br />topographical study of the two sites, preliminary soil analysis, <br />preliminary environmental impact studies, conceptual designs for <br />at 9-12 grade community high school with interim use to include <br />grades 7 and 8 and coordination with the school Superintendent to <br />understand the needs of the school program to translate the needs <br />into a conceptual design on both -sites@ <br />s indicated in the scope of services, the conceptual <br />design of the two sites will satisfy SFSB criteria for <br />preliminary approval for reimbursement informed Ms. Ahl ren. <br />Input will also be coordinated with other Town agencies to <br />satisfy community needs. <br />The final report will compare and contrast the pro's and <br />con's of building the high school on either site indicated <br />Nis , - Ahlren . Cost estimates will be projected for October Town <br />Meeting presentation* <br />Ms, Ahlgren indicated that the sure of $100,000 will be <br />requested for Town Meeting -appropriation to authorize the <br />preliminary design study. It was noted that this will appear as. <br />Article 10 of the Special Town meeting Warrant. <br />*The emotion was made by -Selectman Jacobson to approve the <br />Request For Proposal as prepared by the site review Committee <br />pending Town Counsel's approval of the 1FP . The motion was <br />seconded by Selectman Vaccaro. VOTE: -Lin n im us . 3-0 . <br />Mrs, Greelish recommended to transfer the request for the <br />study from stabilization rather than borrow the $100r000 and pay <br />interest fees. Mr. Whritenour will review this concern. He has <br />recommended to borrow the money and leave available funds in the <br />free cash flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.