Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> Jacques N. and Martha M. Morin <br /> I 1 Hamblin Road (Map 120 Parcel 34) <br /> Mashpee, MA 02649 <br /> FINDING-201815 <br /> The Decision must be rendered in two separate statements/decisions if a Variance <br /> or Special Permit is involved along with a Written Finding. <br /> The Board determined that: <br /> 1. The proposal will not be substantially more detrimental than the existing non- <br /> conforming structure or use to the neighborhood. <br /> 2. The proposal will be an improvement to the lot and is similar in size and character <br /> to other existing structures in the neighborhood. <br /> 3. The proposed structure, based upon the plans submitted to the Board, will be <br /> consistent with applicable State and Town statues, regulations, bylaws and plans, <br /> complies with the dimensional requirements applicable to the lot under current <br /> provisions of §174-31 (Land Space Requirements Table Footnotes) 418 of the <br /> Popponesset Overly District, or for lots which have been developed pursuant to <br /> §174-21,complies with such requirements as were applicable to initial construction <br /> of the dwelling under provisions of§174-21 Nonconforming lots. <br /> 4. Construction of the dwelling is contingent upon Board of Health final approval. <br /> 5. Construction of the dwelling will conform to current building code requirements. <br /> 6. There is adequate land area to provide sufficient parking and setbacks as may be <br /> required. <br /> In view of the foregoing, the Board determined the Petitioner met the criteria for a <br /> Written Finding. Upon motion duly made and seconded at the Public Hearings on <br /> Wednesday, June 13, 2018, the Zoning Board of Appeals voted unanimously to issue a <br /> Written Finding based on the following conditions; <br /> 1. Proposed Site Plan: — Cape & Islands Engineering, for Jacques & Martha Morin, <br /> 11 Hamblin Road, Mashpee, MA. Site Improvements, Date: August 8, 2017, <br /> Drawn by: JB, Checked by: MC, 1) 8/31/17 ---Added Catch Basin and Dry Wells <br /> for Pool & Patio, by: MC, check by: MC, 2) 1/10/18 --Revise Pool, Revise Deck <br /> & Porch, Add Hot Tub, by: JB, check by: MC, 3) 1/19/18 — Show Pool Below <br /> Deck, by: JB, check: MC, 4) 2/1/18 -- Add Offset Dimensions, by: JB, check by: <br /> MC, 5) 3/19/18 —Added, Ret. Walls Around Hse, by: MC, check by. MC. <br /> 3 <br />