My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/17/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
5/17/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:07:46 PM
Creation date
8/10/2018 1:25:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/17/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASHPEE HIGH SCHOOL BUILDING COMMITTEE <br /> TUESDAY , MAY 17 , 1994 <br /> TOWN HALL <br /> Members Present: Peter D i n i z i o, Joe Polito} Bill Martiros , Bill Jones , <br /> Michael Pare , Steve Creel i sh , Merry Sue Ah l g ren , Janice Mills, Joan Tavares <br /> Also Present: Ray Bordwel l , Perkins and Will , Robert Fournier, SM�MIA, Dr, <br /> Lincoln DeMiou ra, Gus Fredricks "Ft0c <br /> Meeting convened at 4 : 1 p .m* <br /> MINUTES <br /> Changes : add Paul Griffin as present, Pg . 7 700 seats , not sets <br /> Merry Sue grade a motion to approve the minutes of May 10 , as <br /> amended . Bill Jones seconded the motion . All members were in <br /> favor . ** <br /> PROJECT MANAGER REPORT <br /> Contracts - Paul - r i f f i n , Ed F rennette and Bob Fournier met to resolve the <br /> contract language . They agreed to include a target area of 183 , 000 sq feet, <br /> llo per sq foot and a budget construction cost of 0 , 130 , 000 , not to be <br /> exceeded . The Committee will hold a contingency of 5 for value added <br /> proposals . <br /> Ian received a draft copy of this language from Bob Fournier, he will pass <br /> it on toau Tiffin and it is thea up to the Building committee to make a <br /> recommendation to the Selectmen to sign i t. <br /> Chartwell has not received a draft contract or a letter of intent . Ian <br /> will talk to Bob wh r i tenou r about i t. <br /> Peter received a draft contract which he passed on to Ian . <br /> Program- Bob and Ray will present the revised program tod air with the <br /> deletion of the large group classroom. That will bring the total sq footage <br /> slightly below 183 , 000 sq feet <br /> �- M r. Fournier will also present the net to gross factor with and without <br /> the mechanical and electrical equipment space. <br /> - Joan Tavares l l p rov ii de information on the location of the Indian <br /> Education space. Joan said she would be late , the committee will get back <br /> to this , <br /> - Ed Frennette spoke with Gus Fredricks about Leisure Services space* Ed <br /> is concerned about the 2 fractions- one wanting large and the other small <br /> amount of space . This needs to be resolved. Selectmen Nancy Caffyn wrote <br /> a letter to the Board of Selectmen on this issue . They did not meet last <br /> night, so the issue is still outstanding . <br /> Peter was told , 200 sq feet would be acceptable i f their main office is not <br /> in the high school * They will need 3 , Zoo sq feet offices if it is in the <br /> high school . <br /> The Committee has to wait for direction from the Selectmen on this issue . <br /> The Committee asked the architects to investigate how much , if any , <br /> community space will be reimbursable from the State. can we build beyond <br /> the 1837000 sal feet and be re i mbu rsed <br /> Site Development -- Ray will present options for the Committee to review and <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.