My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
5/10/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:07:40 PM
Creation date
8/10/2018 1:29:26 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/10/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
q r i tten program: after last week ' s quick calculations , upon review, the <br /> program is larger than they thought last week . It is about 2 , 000 sq feet <br /> over. <br /> Bill Hauck Joined the meeting . He suggested the architect talk with all <br /> department heads , have 1 meeting for review of the site plan . Ian can set <br /> up the meeting. <br /> Paul suggested they think about scheduling a date soon , so everyone will <br /> have sufficient notice . <br /> Written program: Ed suggested the Committee go through the program and try <br /> to reduce the space , They are using a 1 . 35 conversion rate which is the <br /> lowest they can achieve . <br /> Paul Griffin said he has a problem with the 1 , 35 . The mechanical and <br /> electrical equipment rooms are pulled out of the factor, and usually are in <br /> the f actor , so i t i s not really l . . <br /> Mr. Frennette said that is true . They believe it becomes cloudy to have to <br /> many things in the grossing factor . There was no intent to mislead you . <br /> They can calculate it both ways . <br /> Paul said he does not have a problem with them listing the items but the <br /> Committee talked about whether it i s achievable to go below 1 .40 . The <br /> ommi ttee is concerned that above 1 , 35 the circulation space i t too <br /> generous . stating 1 , 35 now would lead the Committee to believe we are on <br /> target but with those items pulled out, we are not . This gives people the <br /> impression we have saved on this plan . <br /> Ray said it was the consensus of the Committee that we put down all the <br /> -pace , so no space gets lost. <br /> Mr. Frennette said next week they will calculate it both ways , <br /> Bill Ma rt i ros suggested eliminating the large group classroom at 1 , 700 sq <br /> feet. There is an auditorium, cafeteria and gyri that could meet this need . <br /> Peter asked the Committee if they want to get back down to the target? <br /> Should we agonize over 2 , 000 sp feet or wait for budget information from <br /> Ian's <br /> Ray said the Committee should reach a consensus of the size they are <br /> comfortable with . The architects feel the net program is a little too big . <br /> (Janice Mills joined the meeting , ) <br /> Ian said he is concerned about the additional 2 , 000 sq feet. He is sure <br /> other things will creep in and by the next stage it may be over by a larger <br /> amount. <br /> Mr . Frennette said his professional recommendation i s to identify an area <br /> contingency. This classroom i s in the heart of the building and it can ' t be <br /> pulled out of the design easily . He did suggest the auxiliary gym and some <br /> number of seats in the auditorium, those are 2 expensive areas . <br /> He does recommend the building be under 183 , 000 right new and that area <br /> contingencies be identified . It was decided two meetings ago that the pool <br /> and administration offices are above the 183 , 0009 <br /> Ray said there is 35 sq feet of storage with every classroom, do you want <br /> to reduce the classrooms to 750-760 sq feet , that would save 1 , 750 sq feet? <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.