My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
4/19/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:06:27 PM
Creation date
8/10/2018 1:42:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/19/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gus Fredericks , Leisure Services Director will do research on the revenue <br /> possib11 itiesM <br /> This Committee gust decide if the pool will be a gym station . The <br /> Committee' s job is to weigh what is the best decision for the town and then <br /> decide how to put it out for communIty decision . The Committee agreed to <br /> look at the whole program, when it is completed , before prejudging how to <br /> make those choices. <br /> Paul Griffin explained to the Committee the $110 per sq foot average cost <br /> w 1 1 1 be i n S A' s contract. we will require thea to go back, if necessary, <br /> to design it to only $110 . <br /> Mr . Fournier added they have to present cost reduction options to the <br /> Committee to look at and Grote in favor of some of them to bring it bac <br /> i nto the budget. we all have to live within the budget constraints . <br /> Paul does not want to see it designed for 120 and then have to go back and <br /> cut items out. From day one it should be designed for $110. He would <br /> rather design it under and then give back some extra. <br /> Paul has an objection to the draft program p resented today which states <br /> $120 per sq foot. From this point on it should be $110 . <br /> auditorium size and stage facilities : the auditorium is presently <br /> scheduled to seat 600 people, which is 1 /2 of the student body. Mr. <br /> Fournier explained because of handicap access requirements , the size of the <br /> room must be larger than Dr. Cal a.bro' s draft. A1so, the desire to make the <br /> room devisable with retractable walls requires wi der isles and also <br /> increases the space needed . The sq footage has to grow to accommodate <br /> these issues . <br /> Dr. Deoura stated the questions to be decided are should it be large <br /> enough for town meeting and how much of a performing arts center will-1 it <br /> be? He does not think you can depend on it as a teaching station ; <br /> The committee agreed the gym bleachers will accommodate town meeting , not <br /> the auditorium. <br /> Should this be designed as if the proposed performing arts center won ' t <br /> happen , or do we coordinate with them? <br /> Janice Mills said she spoke to Mr . Thompson about this issue . The high <br /> school auditorium has to be designed for plays, concerts, etc . we cannot <br /> plan on their facility being available. <br /> The Committee agreed to design a full auditorium to meet the program. we <br /> wont' make our auditorium less because we have one next door . <br /> -� Air conditioning : will this building be air-conditioned? The Committee <br /> would like MMA o look at the cost to put it in l ani# to operate .. 1 R <br /> Fournier said the office space for year round staff will be air <br /> conditioned, as will the auditorium,. <br /> Community awareness program, what does the Committee have to do? <br /> Merry Sue asked when the charette will be . That is her idea of community <br /> access. <br /> Mr. Fournier said it will be during the schematic design phase , according <br /> to the preliminary schedule during the --4th week of May, <br /> Who should be there? who does SMMA need there? <br /> Mr. Fournier said they do not need anyone there, but if you want to come in <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.