My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/15/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/15/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:05:08 PM
Creation date
8/10/2018 1:52:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/15/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
z <br /> MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES <br /> TUESDAY, FEBRUARY 15 , 1994 <br /> TOWN HALL <br /> Present: Peter R i n i i o, Janice Mills, Merry sue Ahlgren , Bill Jones B1, 11 <br /> Ma rt i ros aPolito) Steve G ree 1 i sh, Paul Griffin , Michael Pare, Joan <br /> Arrant Tavares , Greg Taylor <br /> Absent: Jayne Hendricks <br /> Meeting convened at 7 .eO2 p .m. <br /> MINUTES <br /> K <br /> Ms, Ah 1 g ren made a motion to accept the minutes of Jan, 18, Jan . 25 <br /> and Feb. 1 . Paul Griffin seconded the motion. All members were in <br /> favor. <br /> COMMITTEE DISCUSSION RE: ARCHITECTURAL FIRMS <br /> Mr. U i n i z i o suggested the Committee talk about each firm in chronological <br /> order (according to date interviewed ) . Each member can say how they felt <br /> about each of the firms . The committee agreed. <br /> EES <br /> Bill Jones thinks they are a complete firm, have a good track record build <br /> efficient buildings. They are one of his top choicesi, <br /> Merry sue agreed they are one of her top choices. They �have Cape <br /> experience and worked with cape architecture. <br /> Janice Mills also ag reed they are one of her to choices .p There basic . <br /> design is very efficient. <br /> Paul Griffin agreed Keyes is a very good firm. I f they were chosen, <br /> we <br /> can talk about our concerns about lack of "flair" . He liked all their jobs <br /> he visited . He is concerned the Groton school had some problems which was <br /> mainly contractor responsibility but Keyes a0reed they should have followed <br /> thea more carefully, <br /> Peter explained some of the problems at the Groton school , The town will <br /> have to pay for those repairs , The computer system 148 not up to speed, i t <br /> had a lot of problems. This Building committee would have to be sure to <br /> put more "flair into the design. Aside from the problems 't Groton , the <br /> other schools were nicely done. <br /> Bill Martiros agrees with Paul , he was on the same trip. They don 't seem to <br /> be very imaginative, <br /> Joe said having all in house disciplines i s a plus. The concept for <br /> Marstons Mills school worked, A lot of creativity will be required and <br /> that will have to be looked at hard . He does not know if Keyes will be <br /> able to do that,. <br /> Steve is impressed with their broad base of architectural work. He did some <br /> background on the Groton school , it was clearly the contractors problem and <br /> the school committee or clerk of the works let -them get away with it. He is <br /> familiar with that contractor. We saw innovative use of materials at the <br /> Marstons Mills school , <br /> Michael Pare took an analytical approach , He first went through the state <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.