Laserfiche WebLink
11 -5- eliminate entire football /track comp1e , *NO. <br /> 11-6- ommittee agreed not to eliminate any fields at this point.- <br /> 11-7- <br /> oint.- <br /> 11-7-- Single entrance road instead of double barreled . *NO. <br /> 11-8- reduce irrigation system not eliminate . <br /> 11-9 bleed review by SMMA. <br /> Greg Taylor thinks they over estimated the cost of clearing and grubbing . <br /> The number should be reviewed again . <br /> 11 -10 Reduce site paving . SMHA review <br /> 1 1--1 1 . Talked about previously 11 -7 . Joe asked if they can get parking <br /> � <br /> closer t the front door? They are working on it . This is a design issue <br /> for the architects , not an issue for the Committee <br /> 11-14 For SMMA review . <br /> 11 -15 Pre cast concrete not granite curbing , <br /> 11-18 reduceparking stall size . 1 i s smaller than what -i s required . <br /> Dan suggests seeking a variance . SMMA will review, <br /> 11 -9 *Reduce flag poles from 4 to 241 <br /> 11 -24 Commi tte agrees to combine fire and domestic water service . <br /> 11 -28 create a walkway from "intersection to the campus . G&P agree bort <br /> made no decision on material . Ray asked if it would require lights? I t <br /> could become a safety issue . <br /> *The Committee agreed to put a sidewalk at the front entrance , up Old <br /> Barnstable road , no path ,, <br /> 11 -29 Reduce paving thickness . <br /> Tony Estees said it is very thick . <br /> Bob Fournier doesn ' t think they need the thickness . <br /> *For SMMA review and re comae nd at i on <br /> 11 -31 eliminate parking lot islands . G&P think they prov i de a good <br /> architectural feature to the lot. Cary use bituminous berm instead of <br /> concrete . *Committee agreed not to eliminate . <br /> 11 -32 depress football field . No <br /> 11-33 Drop off area closer to the building . Being investigated <br /> 11 -34 Use on site sand and gravel S A would 1 ove to They need t <br /> results of the geotechnical report . <br /> 11 -35 *Pedestrian paths should be you re d on site concrete <br /> 11 -36 6 reate drop off for visiting team. They can be dropped of-f now i r� <br /> front of the gym. it is already there t <br /> 11-38 SMMA issue . <br /> 11 -40 *Rotary at intersection . <br /> 11 -41 relocate footba1 `1 field to northeast corner of the site . *NOM <br /> 11 -42 Dead end cul, de sac at southeast corner . would core as a great <br /> sacrifice to <br /> the circulation th rough the site . It is not a high traffic <br /> area. *NO. <br /> 11-43 Eliminate lighting at -fields . $100 ,000 for f i e 1 ds a 40 , 000 at <br /> tennis . <br /> Steve asked if there is an alternative , comethin less than spec <br /> 11 --44 Lighting . wi11 discuss with Com Electric . what is cheaper to operate . <br /> P-1 delete aux gym -- Hold ., <br /> P-2 No <br /> P-3 NO, <br /> P-4 No. <br /> P-5 more compact footprint . Pau 1 sa i d that should always be the goal . <br /> 7 <br />