Laserfiche WebLink
Elias McQuIad is setting up a meeting with the DFP next week . <br /> Steve Greelish will attend on behalf of the Committee . <br /> Peter asked what the risks are with asking for a variance for <br /> 14 , 000 gallons per day" <br /> an sai the r i i .i , and you may get turned down ., <br /> Peter mentioned there may be a possible conflict of i n to rest with <br /> Mark Pare of DeFao wait and Pari , <br /> SMMA ' s engineers, Mark Pare <br /> wrote the rev i s i ons to Title V and we are now asking him to get a <br /> variance from somethinghe wrote . Will he pursue the Town ' s <br /> i me res f or his repu tat i on j <br /> Paul said the Commit-Lee should ask SIMMA to change their <br /> consultants . mark Fare has his mind set l way only . Personally , <br /> PaU l f Ound him very frustrating to deal with . Do we have the <br /> authority to ask SMMA to change their consultant? <br /> Tom Fudal a noted if they do have to bU l l d the full plant, Mark <br /> Fare is very good . Is there any war Chartwell ' s conSU l tant can <br /> be used to apply f o r the variance? <br /> Paul thought the Committee has agreed' t�,�ey would as[L for <br /> physical plant to be sized for 28 , 000 gallons bUt 11t be designed <br /> for 14- 15 , 000 gallons per day. If w1 loose the variance request <br /> they can modify the design up to 28 , 000 gallons . <br /> At this time the architects arrived , The Committee explainrad <br /> they feel there is a conflict of interest with DeFao wait acid <br /> Pare. The Committee feels SMMA has to determine 1 f the 1 r <br /> consultant should be kept on , he is not representing the Towns <br /> or SIAMA ' s interest . <br /> Thi Board of Health wan is the Comm i tte, to i nvesti a t e a <br /> gallon per day tertiary treatment plant. <br /> Bill Hauck suggested building a system for 14, 000 a 1 l ons with <br /> additional piping for an additional 14 , 000 and shut l section <br /> off . <br /> Paul said the cost for a parallel lel system is more . I-11" the plant <br /> COST-Is $800 , 000 he thinks that Sys tem would cost $1 , 1 million ,, <br /> Paul recommends hi.t i 1 d i ng the building for 28 , 000 gallons and ask <br /> the engineers to design for 14 , 000 gallons . The risk is they <br /> will have to re-design Lip to 28 , 000 gallons and there will be an <br /> additional fee . At this point, they are not very far into 'the <br /> design . <br /> Ed Frenette asked the Committee if they are accepting the risk of <br /> re-design if the variance is not approved? <br /> Peter said the DEP w-i l l he meeting �%ii th Elias PicQuai d next wee--3k. <br /> The.re will be more answers at that point . <br /> Tori Fuda l a suggested qui nq through the env i ronmtenta l review <br /> prose-ss with 28 , 000 gallon plant- a 14 , 000 plant will be less of <br /> an i?,npkt <br /> 2 <br />