My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
9/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:15:36 PM
Creation date
8/10/2018 3:10:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
conditions for pedestrian circulation , <br /> Ed said with the constantly Changing vista , you are more aware of the trees <br /> than the road . This design capitalizes on the site . <br /> Dr , DeMoura is concerned about maintenance required for the pl ant i r-19 . <br /> That should be considered . <br /> Dan has been given that charge ( low maintenance ) by the ommittee . <br /> For the next meeting he wi i 1 have details of the courtyard and area behind <br /> the cafeteria. <br /> Islands i n parking rig 1 of will be woodchip mulch and native plants , <br /> Dr , DeMou ra said in Sandwich the s i de�{ra lIps are built large enough to put <br /> snow p l ow,5 on them. <br /> Dan is showing a orjrbed walk of 6 feet width . <br /> Steve said most plows are 8 feet , <br /> Dan thinks 8 ft sidewalks are overbuilt and e pen i ve . <br /> Merry Sue questioned the reed for sidewalks the entire per i meter t <br /> There were concerns about the amount of snow p 1 ow'i ng required . Peter said <br /> only the entry into trhe building will reed tQ be p l ovied immediately . <br /> Bi l l a� <ed about - radiant.. heat? }V <br /> Paul � 1 d it •i very e p�n s i y i e L Y goes o 1 1 every ti1 4 1 thc,--. J-Y+�e m p e r -.0 1 e <br /> below 34 degrees ,, I t 1 - a 'I Llr<Ll r r th- school depar'tmen't can ' t afford . <br /> Dan suggested t alk-i re q about a1 1 the walkways wh:an the plan an a l arq-:�lr <br /> sia e . <br /> Merry Sue asked how much more road is requ! red by going around the tope <br /> Dan said about an additional 400 feet. <br /> The C mmi ti-ee d i ;r�sussed mov i nq the football fields . Dar) a l so el i mi hated one <br /> baseball field in favor tel= two practice fields . <br /> There is a 10 fort drop/slope next to the football field which mak-es it <br /> d i f f i ou I t to put a practice field there . <br /> Merry Sue said there a. not enough other ba eba l l fields in tern -to <br /> eliminate that one . <br /> There is an area included for future expansion . <br /> Dr . DeMou ra 5aid the reality is whatever we open with is what wi `i 1 be <br /> there . He does not see money for expansion . <br /> Dan said if it were not for environmental concerns the area closer to the <br /> river would be great for a fieri -1 <br /> From the edge of the ba ebal l field to the river ie 610 feet . <br /> Steve said Cons Com wanted 400 feet but never, voted on i t. The 1 a <br /> requires only 100 feet from the r i \ve r . Everything more is an accommodation . <br /> Bill thinks the Cornmittje.e should accommodate their reeds <br /> The Committee agreed they should put one baseball field back ip <br /> They like the new location of footba l 1 /'_.ra 1� . <br /> Pe te l- suggested put I n Uhe p ract :tee field south , rathe i than toward the <br /> river to avoid oonf l 1 �t . 4 1 then <br /> '�f 4 1 l_. 1 <br /> Steve a i R� if it will cost 14x1/t e to 90 W W V1 th , •1 e i g a i �1 q L+ t�i ��� R <br />
The URL can be used to link to this page
Your browser does not support the video tag.