My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
10/25/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:18:59 PM
Creation date
8/10/2018 3:15:58 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br /> 1 . change gallery wall to GWB from brick . Flay disagrees. <br /> 1 a Ed does not recommend this change . Flay does not recommend it either, <br /> don ' t close in the classrooms. These windows are an important aspect of the <br /> design <br /> 20 . R a will review this. <br /> 19 , The committee does not agree with this recommendation . <br /> 18. Skylight - Ed said they will try to find a way to do this . <br /> 17 . Ray said he will try to reduce the clerestory window but keep light <br /> coring in. <br /> 16 , Ray said GWB i s more desirable, Hold . <br /> 15 , Ed said he would accept this recommendation . Ray agreed . <br /> The Committee agreed . <br /> 2 <br /> and 1 = 1 ,000 , can sMMA save 40 , 000 on those items. They said <br /> they can. <br /> Ed said they are trying to save as much light coni ng into the building as <br /> poss <br /> i ble, and surfaces where they can pick color and pattern. <br /> 27/28, The Committee agreed to delete them. <br /> 6- Duel Fuel . Bill said there i s an incredible amount of savings <br /> associated with this - $50 ,000 per year, every year . Paul said he agreed <br /> but the committee has no choice, they have to cut it. <br /> Mechanical/Electrical engineer suggested buying the boilers for duel fuel <br /> and the tank/containment can be added later. That way you still have the <br /> capability . <br /> Joe made a motion to put in the boilers for duel fuel but not the <br /> tank or lines , Merry sue seconded the motion. 4 in favor, l <br /> against. <br /> 6 . Reduce gym bleachers to Boo . <br /> Joe rude a motion to reduce gym bleachers down to Boo . Janice <br /> seconded the motion. 3 in favor, 1 against. <br /> Paul said we must meet $21 , 1 million ( including $600 , 000 value added , <br /> 500 , 000 contingency) Now it is $800 , 000 off, <br /> There are some areas which need more review f <br /> Any more ideas to get down another 800, 000? <br /> Last week the committee removed the janitors bathroom. Teachers bathrooms <br /> w ill all stay i n. <br /> Shorten hot water return . Paul suggested only 2 not 4 boilers are needs. <br /> Paul suggested using an alternative to brick, less expensive masonry <br /> product for the rear (east side) of the building 4 <br /> Ed said their could do the whole building in a deco rat i ve block , H e would <br /> like the committee to look at that. It would be substantially cheaper than <br /> brick. <br /> Bob suggested they could reduce the cost of the STP from $800 ,000 to <br /> 700 , 000, Everyone agreed. <br /> -- <br /> Everyone a g reed to assume their could reduce the thickness of the paving,, <br /> Irrigation system: <br /> Merry sue made a motion to delete the irrigation s steer for a <br /> savings of $77 , 000 . Joe seconded the motion, All members were <br /> in favor. <br /> Paul said there is 8007000 of cost associated with the brick. can SMMA <br /> 1i <br />
The URL can be used to link to this page
Your browser does not support the video tag.