My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
12/13/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:25:00 PM
Creation date
8/10/2018 3:23:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MEETING MINUTES <br /> TUESDAY, DECEMBER 13, 1994 <br /> TOWN HALL <br /> Present- Peter D i n i z i c, Joe Polito, Janice Mills, Bill Ma rt i ros a Merry sue <br /> Ah I g ren , Paul Griffin , Steve Gree l i sh <br /> Also Present: Ian Aitchison , Torn Wren , ESI Fre nett , Phil Pc i nc 1 l i , Brian <br /> Lawlor, Bill Hauck , Dr. DeMcura, Greg Taylor, Mike Pi trowski <br /> Meeting convened at 4. 08 p .m% <br /> COMMITTEE DISCUSSION <br /> Janice explained last week she, D r. DeMou ra} Phil Pc i ne l l i , Manny Tavares <br /> and Joe Polito met to go over the plans . Those plans were not up to date <br /> and Phil and Manny Tavares juggled around the music and art rooms . Joe and <br /> Janice told thea not to make that change. she said the committee needs to <br /> demand up to date plans and study thea on a weekly basis., Things are <br /> happening the committee does not know about. <br /> Paul said not all the plans are on CAD yet so it is a problem keeping them <br /> updated. Paul went to sMMA's office last Tuesday and Phil has found a war <br /> to eliminate a corridor on the second floor , for a cost savings. They are <br /> critiquing the plans - in an effort to save costs but they do not have <br /> permission to juggle things without getting specific permission from the <br /> Committee . <br /> Janice said they were not even aware of the changes Merry sue and Ray had <br /> worked on. <br /> Paul said the Committee can bring that to the attention of sMMA - the <br /> Committee wants any changes to come to them before they are made . <br /> Peter said at last night' s meeting the selectmen did not support finding <br /> additional space for the Superintendent so he will be in Town Hall until <br /> the High school opens and then provisions will have to be made for his <br /> space in the High School * <br /> Paul suggested getting the principal on board first and he can begin <br /> programming and find a suitable location . <br /> Committee Di scussi cn with Mr . John Brooks of Brooks/Flemming Technology <br /> Consultants. <br /> Paul asked him to give the committee a history of his company and what they <br /> can do for the High school . <br /> Mr . Brooks explained their are engineering consultants based in Burbank, CA, <br /> There are 8 asscc i ates each with different specialties. Their clients are <br /> architects, schools, Tv networks and motion picture studios . They do <br /> commu n i cation engineering consulting - audio, video control , data and <br /> telephone systems. <br /> He sees a mel di ng of technologies. Synergy system i s one type of system <br /> for integration. He has just worked on a high tech restaurant (owned b <br /> Steven pe i l be rg) that used it to control all high tech equipment in the <br /> restaurant. <br /> They are strictly consulting engineers. They recommend approaches to take <br /> and then engineer them, they work with the architects , They do not buy or <br />
The URL can be used to link to this page
Your browser does not support the video tag.