My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/8/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
7/8/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:46 PM
Creation date
8/20/2018 12:44:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/08/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> MASHPEE HIGH SCHOOL BUILDING COMMITTEE T MEETING MINUTES <br /> MONDAY, JULY 87 19996 <br /> SENIOR CENTER <br />' Present : Paul Griffin, Merry Sue Ahlgren, Stere Greelish, Peter <br /> Dini io <br /> Also Present: Jim Byrne <br /> The Committee reviewed the plans for the additional fields, road <br /> work and site lighting. <br /> This bid also includes irrigation of these fields. <br /> The fence is included in the base bid. It is an 8 ft fence <br /> around the perimeter of the football field with a 4 foot one <br /> around the inside of the trach. <br /> Paul would like to see another gate added. <br /> The sidewalk along the entry is a requirement of the Cape Cod <br /> Commission. <br /> Lighting is for the football fields , basketball courts and tennis <br /> courts . <br /> The State wanted to see 4 lanes on old Barnstable load, so the <br /> a <br /> design now includes ,4 lanes. It required some takings . <br /> Paul made a, motion to forward to the Selectmen for their <br /> approval the bid from P . Landers for additional site work <br /> to include additional fields , field lighting and road <br /> work, for $644 , 000 (Base bid plus 3 alternates . Merry <br /> Sue seconded the motion. <br /> Discussion: <br /> Is the road work a good price? <br /> Paul said it is. <br /> All members were in favor 4- <br /> CCD ##I8 for the curtain for the auditorium, additional air <br />=t conditioning for auditorium and lighting in the TV studio of <br /> f <br /> $40 , 000 . Paul explained that Joel feels the TV studio lighting is <br /> 4 <br /> an integral part of the job., <br /> Stege said there is no way it should cost $40,000we will have <br /> to do it when we do the other lighting. <br /> Merry Sue wants to see details. <br /> Paul said Joel feels it is important to do it asap. There are <br /> ceiling changes, pole rigging , a lot of' circuits . He does not <br /> disagree with Steve, It is a lot of money,@ <br /> He will take $40 , 000 out of CCD 1 . <br /> Paul suggested having dike talk to the Committee about what <br /> lighting is required for each of these locations. <br /> Paul spoke with Manny Tavares today. He feels the 44. 8 million <br /> will only be slightly under. It will depend on what we select <br />
The URL can be used to link to this page
Your browser does not support the video tag.