My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/27/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
6/27/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 10:21:01 AM
Creation date
8/20/2018 1:31:00 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/27/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bob rBarthelmes , project Manager was present . He said he has worked on over <br /> 12 sChoo'ls , most in the same size range as this one . The Clearing <br /> operation will be completed riddle to end of next week . Wi.thin. i 1/2 weeks <br /> they will strip lo-ain in areas of grade changes . 270 feet of footing will <br /> be placed tomorrow. The original schedule Called for over 200 ft per day <br /> but they will be doing 250 feet per day. <br /> The trailers are on site now with phones , faxes . They are waiting for <br /> copiers . They are talking about adding security measures because the <br /> trailers were broken into last might $ <br /> Peter suggested -they coordinate with the Chief of Police , maybe they Can <br /> start patrolling the site at night . <br /> J im Byrne said the Superintendent met with the Police and Fire Chief and <br /> asked for patrolling . Unfortunately, they are required to put a gate up, <br /> which tends to keep police out but it will also prevent large equipment <br /> from being removed* <br /> Stone will fence in the trailers and have that area. lit $ <br /> Mr. Barthelmes asked that if anyone comes on the site , they Check in with <br /> the superintendent on site ., They do not want anyone to get hurt . Paul said <br /> the Committee supports that 100% 0 <br /> Ja.ni.ce suggested a. sign saying that be posted. <br /> Paul said visits to the site should be limited to officials of the town, <br /> others should make a request of this Committee . <br /> Mr . Barthelmes said a bard hat and proper footwear a.re requirements on site <br /> and he suggests wearing pants . <br /> Paul suggested Jim Byrne write a memo of those requirements and give it to <br /> Bob whritenour to circulatef <br /> Paul explained the Committee is concerned the schedule has slipped from the <br /> 0 day schedule . The Committee wants reassurances that it won' t slip <br /> further . The town needs this building open in Sept . 1996 . <br /> Mr. Barthelmes said Stone needs to have the building finished also F <br /> The structural steel is scheduled to be placed in mi.d. September and there <br /> is no question they will meet that , <br /> Paul asked if there were full time staff from Stone on the job now' <br /> Mr. Barthelmes said there are , he is there -4 days per week. The project <br /> superintendent is there every day. <br /> Bill Hauck, Building Inspector discussed with the contractor procedures for <br /> him to track what is happening . <br /> Paul told Mr. Barthelmes that the building department is very cooperative <br /> but it is a small department , the more time they Can give hem the better <br /> off they will be <br /> Tom wren gave Committee members an updated preliminary 60 day schedule . He <br /> has asked the contractor to show work which was done the previous month, <br /> work to be done in the upcoming month, to be extracted from the CPM in a. <br /> bar Chart form. <br /> Paul said it looks like there has been Clean clearing in some parts of the <br /> 2 <br />