Laserfiche WebLink
Paul will review it fur the r with s\ENiA ' s electrical ena ineer w <br /> iMMA presented a fee proposal for $72 : 905 for additional services <br /> to incorporate the additions to the project . <br /> Paul. asked SMHA , had their estimator not told. the Committee the <br /> job was $3 million h i h� these '.teras wol.d have been in the job <br /> (not add i t ions ) . 19 by does the committee owe them an additional <br /> fee? <br /> Joel explained 13 of the items were deleted in the design <br /> development stage , there were no contract documents developed for <br /> them. That estimate was reviewed by SMMA, Chartwell and the <br /> committee and by mut-ual consensus agreed to . The overall figure <br /> of $100 per sq foot was considered rea.sona.bl e . <br /> items were deleted at the schematic phase , w1i1ch was even <br /> earlier . <br /> 1 item was deleted as the di.rect ion of SGS ( tate ) , <br /> items #12 , sl-te accessories } and #iia food service egUipm nt <br /> were deleted at the contract documents stage ,. <br /> Pail said he is not sure you can blame Daedul.as back at the <br /> ear ler estima.tes . There were not many items removed from the <br /> final phase . <br /> Joe asked i f' there i s any discussion to revise that figure , to <br /> one that is not as high as $72 , 000 . <br /> Steve said if $72 , 000 is the total , he does not object <br /> Merry sue said the project is getting 1 million of changes for <br /> $72 ) 0000 <br /> Joel reminded everyone the contract documents were manipulated to <br /> allow them to purchase the list of alternates ) they were not <br /> deleted . <br /> Joe asked if any conceptual work was dome on these items'? <br /> Paul said the $72 , 000 is based on what It will take to get the <br /> work done , on man hours , not sq footage t <br /> Joel said the contract documents will have to be modified for anv <br /> work to be added. <br /> Steve said 7 fee is average , This is a hard 7% for sMMA a there <br /> is a lot of cut and f i tt i-ncf to be done . <br /> Torn wren asked it this is a lump sum for all the change orders , <br /> is it a not to exceed figure .? <br /> Joel said the work is in direct correlation to the list of items <br /> voted on. It is a. fixed fee . <br /> Is the auditorium seating from the FF & E budget? -No is part of <br /> the general contract , so is the kitchen equipment, <br /> Joel explained he was asked to contact MEPP and the cape Cod <br /> Commission regarding issuing the additional site pa.ckaue early to <br /> give the information to the contractor ( in hopes of getting the <br /> best price ) , SNIMA has asked for unit prices for clearing and <br /> 6 <br />