Laserfiche WebLink
f ' <br /> L <br /> Mashpee will have to pay them. <br /> The Committee can tell them these numbers are unrealistic and .go <br /> back and re-do i t t negotiate . <br /> Peter asked why they didn ' t toll the Committee they were <br /> approaching the limit on meetings? <br /> Paul said right or wrong , the Committee continued to schedule <br /> meetings beyond the 21 meetings . <br /> 8e fore any further negotiating or, settlement , this should be <br /> reviewed by town coUnsel. . <br /> Peter asked i f SMNIA would be coming to the Committee if the job <br /> came in over? <br /> Paul asked, however , did they spend the hours and did the town <br /> get value from that wo r]O <br /> Peter said SMMA is divorcing themselves from all responsibility <br /> from Daedul.us . They are not concerned about Daedulus ' error . <br /> Cape Cod Comma.ssion : Paul explained they wanted $10 , 000 in their <br /> ori g ina.l. proposal. but it was cut ,, <br /> Peter asked if we didn ' t alrea.dy spend an additional $70 , 000 for <br /> the EIR9, How do you know it wasn' t rolled _into that process <br /> Agency Approval : Paul does not - want to g.�iv e therm $18 , 000 but <br /> there were a lot of extra meetings , <br /> Steve said the 2 engineers created some extra hours but the <br /> approval process moved smoother than he imagined . Their <br /> engineers resistance to the unapproved plan caused the Committee <br /> grief. <br /> ( Joe left the meeting at 6 : 40 p . m . ) <br /> Peter asked if the Committee has to pay for makincr there more <br /> efficient , is its our fault-9. <br /> PaLLI said seeking approval for an unpermitted plan was never <br /> discussed d.ur.ing negot iat iorls . They bid the 'ob having had no <br /> meetings with the Committee . <br /> Paul said the question is did they perform the extra work to <br /> provide the savings to the end product? if it goes to <br /> litiga.tzon, he thinks we will have to pair them <br /> Value Engineering : Everyone had a problem with this entire <br /> issue . The Committee does not feel they are entitled to more . <br /> Design Studies : The Committee did not pay them to design a pool . <br /> r.. They asked sMMA to look at incorporating the WWTP into the <br /> build I ng but the engineer said not immediately. <br /> Steve does not see anything ( from their list) that is not within <br /> the normal bounds of a design <br /> Merry Sue said a lot of elevations were done because of the <br /> budget . <br /> Paul said the original contract states how many renderings they <br /> will provide . The town did get a. discount on the roofs and <br />