My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/19/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
6/19/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:07:32 PM
Creation date
8/20/2018 2:03:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Paul said he spoke with Jim Anderson a while ago about this <br /> space . He told him we did not want this space to be disqualified, <br /> and it would probably be a minor amount of money to retrof it. He <br /> said if it is not a lot of money, he would most likely overlook <br /> it. <br /> Steve said he has not problem using the space for this purpose , <br /> e has a problem with the retrofit costs * they are outrageous* <br /> Paul said stone will not do anymore pricingo we can let them <br /> shop it out . <br /> John Williams suggested putting a modular house on the site . <br /> gg � ' <br /> Peter said the Committee looked into that , to make it handicapped <br /> accessible it would cost $200 ,000 , <br /> Vote on motion to recommend a not to exceed amount of <br /> $65 , 000 to the Selectmen: 4 members in favor: Paul , Joe , <br /> Peter and Perry Sue , 2 against, Steve and Bill . <br /> Paul said the estimate to make changes, as requested by CCR, care <br /> in at $307 , 000 . The wiring for the classrooms is $30 , 000 , <br /> Mike Kirwin said the $30 , 000 amount is perfect. He would like to <br /> review the package and thea respond. <br /> Paul said we have to get going on the classroom piece , let the <br /> auditorium piece go for now$ <br /> Steve asked what the $30 ,000 of additional wiring is' <br /> Alike Kirwin explained it: infra red control limes throughout the <br /> building. Add 2 co axial cable and 2 audio cables from the TV t <br /> the teachers station at every teaching space. It is a long <br /> distance, about half way across the room from TV to teaching <br /> sta.tio 0 ft at least ) . <br /> Steve wants to take a, hard look this. <br /> Paul said we can table it but it is a risk. <br /> Peter asked what the $300 , 000 figure includes? <br /> Paul said they are things we needed to add from the technology <br /> package . To tura the stage into a, space good for video so it <br /> could be used- as a. large TV studio. <br /> Peter asked if this is the most cost effective way to spend <br /> $300, 000, it is not an educa.tiona , necessity. <br /> Paul said we have already paid SMMA and CCR to design this, now <br /> it is time to step up to the table to pay. It should have been <br /> questioned before . All of this is in the original. $4 . 7 million <br /> technology budget $ <br /> Dike Kirwin from CCR was present to discuss the results of the <br /> tec nology .bids. <br /> Telephone system: he presented a. letter to the Committee <br /> recommending they approve and award the contract to National <br /> Telephone . They were the lowest bid. The letter incudes an <br /> analysis of the bids. ` Means the information was not supplied. <br /> Steve asked for their insight as to why there is such a wide <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.