My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/24/1997 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
9/24/1997 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:11:15 PM
Creation date
8/20/2018 3:06:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'the School Department also requested portab to bleachers for the baseball fields. <br /> Dr. DeMoura said he submitted a memo with the size and cost of the units. They would ike a{ <br /> couple for each field. Dr. DeMoura priced them at$24,000 which would be the high cost <br /> st <br /> i <br /> because s would have to go out to bid. <br /> Paul asked realistically how many spectators do we expect t � <br /> � get at games?mow many do they <br /> get in Falmouth. <br /> Kathy Lynch went to a baseball game at the Middle School last year where the visitors <br /> had more <br /> spectators than we did. <br /> Dr. DeMoura would also like benches for the football field for the players. <br /> Paul will research it over the next few weeks. <br /> Kathy Lynch said thy will also need a golf cart to talela ers off the filed when the are e hurt. <br /> Peter suggested asking someone to donate one. Mr. Horne tried that and was turned down. <br /> R Security System: <br /> Dr. DeMoura explained when the budget was cut, the security system was downgraded. The <br /> would like to be able to have separate security zones for portions of the building,presently h <br /> ey <br /> cannot do that. It is estimated to cost $8,000-$10,,000 to re-work it. <br /> At a rninimurn they would like to have 3 zones and a flexible main panel to make changes. <br /> Paul will look at it. <br /> i Elevator: it needs to be locked with a key from the outside, presently they cannot do that. Now <br /> it locks from the inside and the doors remain open and people can access the phone. <br /> The elevator company said it is possible and allowable to lock it from the outside. It would cost <br /> 600. <br /> Dr. DeMoura explained the button for the steel door is on the wrong side of the door- it is on <br /> the cafeteria side which is the more active side. They would like to puta guard, which can b <br /> looked, over the panel. <br /> Paul made a motion to approve $600.00 to make changes to the elevator as requested <br /> by the School Department. berry Sue seconded the motion. All members were in <br /> favor -0* <br /> Chartwell presented a frame with photographs of the high school in various stages of <br /> construction as a gift to Paul for all his efforts. Paul thanked Chartwell, <br /> John Williams explained there are some rooms where the phone linos are not activated or there <br /> are no phone lines. <br /> Paul said he would like then to determine definitively,, in all rooms what is needed before <br /> proceeding with any work. It could just be a programming issue, <br /> John Williams also said there are rooms without loudspeaker. Jing never received a list of <br /> which rooms it is. He has authority to add the loudspeakers as well as clods in the caf'etenia and <br />
The URL can be used to link to this page
Your browser does not support the video tag.