My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/18/1998 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
3/18/1998 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:04:39 PM
Creation date
8/20/2018 3:08:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/18/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE HIGH SCHOOL B ILDING COMNII[TTEE ME,ETING MFVffES <br /> E DNESDAY,MARCH 1 , 1998 <br /> HIGH SCHOOL <br /> Present: Janice Mills, Steve Greelish,Bill Martiros,Paul Griffin,Merry Sue Ahlgren <br /> Also Present: Jim Byrne, fan Aitchison,Dr. Lincoln DeMoura}Mike Pletrowksi <br /> MINUTES <br /> Merry Sue made a motion to accept the nninutes of January 8'. Janice seconded <br /> the motion. <br /> Discussion: when discussing the outdoor lighting, it should read they measured form the ten year <br /> line not the 1 yard line, <br /> " All members were in favor -0* <br /> BUDGET RI VIIEw <br /> Jin}explained the budget presented today reflects all hills being paid at today's meeting. <br /> The bottom line is claims against PA Landers- $x2,995. we will hold that much back from <br /> then. <br /> They still have work to do on the baseball fields. <br /> Handicap violations'. SN4NIA has prepared a bid package for the work which needs to be done <br /> and will put that out to bid, along with the masonry work around the windows which needs to be <br /> done. They expect each to cone in under$25,000. <br /> Janice asked if these violations occurred because of new rules since the design of the building? <br /> Jirn explained some things we knew Stone had installed wrong, and we had hoped we would not <br /> have to do the work but we do: missing curb cuts, slopes, add a sidewalk from the back parking <br /> lot to the hal lfi gilds, cut the guard rails. <br /> Paul said we did ask for exemptions on items and got it for some. <br /> Jim explained we will remove the sidewalk in front of the building because we would have to <br /> move irrigation and lights so it is easier to must remove the sidewalk instead. <br /> Paul explained the second package is to fix the cracked masonry around the windows. Only <br /> some are cracked but we will fix there all because we don}t want more to crack in the future <br /> with no money to fix it. <br /> Jamice asked who is at fault in this case. will we go after someone? <br /> Paul believes SMMA should have foreseen the issue,they disagree. Paul needs to get another <br /> op inion. Stone says they have a written report frorn a structural engineering firm saying the <br /> footings settled, causing the cracks. Neither Stone nor the engineering firm could produce the <br /> report. <br /> Paul said if the footings settled, there would be interior cracking also. <br /> Janice is concerned about paying$25,000 to fix it. <br /> Paul said he is pursuing it. Where are some issue we took in the settlement with Stone,that are <br /> all rolled into one lump some. He thinks the engineer should have foreseen it. <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.