My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/6/2009 BOARD OF SELECTMEN Minutes
>
7/6/2009 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:20:08 PM
Creation date
8/31/2018 10:40:36 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
07/06/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board ofSelectmen <br /> Minutes <br /> July 6, 200 <br /> Sewer Commission—Status RMrt: (continued) <br /> Three major portions of the study completed by Stearns&wheler include <br /> Needs Assessment Report, a Technology Screening Report and a Draft <br /> Alternative Scenarios Analysis and Site Evaluation Report. The Draft. <br /> Alternative Scenarios Analysis and Site Evaluation Report prepared in <br /> March of 2008 describes four alternative scenarios for the development of <br /> wastewater facilities to meet the nitrogen loading targets established by <br /> the IBP and EPA for Popponesset and wauoit Bays. <br /> The scenarios include the following; <br /> 1 developing wastewater collection and treatment facilities for those parts o <br /> the study area-not served or proposed to be served by existing private <br /> wastewater treatment plants DTPs <br /> 2 utilizing a number of the existing private WWT s-as the basis for-a <br /> municipal system through the expansion of those facilities and their <br /> collection systems <br /> 3 developing sewer systems for'each of the four towns in the study area <br /> separately, with no inter-municipal cooperation and <br /> 4) closing down the existing private treatment plants and developing a large <br /> traditional centralized municipal sewer system to serve the entire project <br /> area, including parts of the adjacent towns through inter-municipal <br /> agreements. <br /> 5) The fifth scenario, the July 2008 Nitrex Technology Scenario Flan <br /> prepared by Lombardo Associates is based on 16 neighborhood cluster <br /> systems utilizng Nitrex systems. <br /> The scenarios have been forwarded to Dass Dartmouth for analysis. <br /> The"Town is expected to receive the modeling results in 30 to 60 days. <br /> It was agreed the Sewer Commission would update the Selectmen on the <br /> results by the end of September. { <br /> It was noted Haat Mashpee participated in an EFA funded study with the <br /> Towns of Barnstable and Sandwich. A report entitle "Inter-municipal <br /> Watershed Planning and TMDL Implementation to Restore Embayment <br /> Water Quality on Cape Cod; Three Case Studies of Towns Sharing <br /> Coastal watersheds"was published In November-too . <br /> Representation from the Mashpee Sewer Comim'ssion is'also attendg <br /> meetings with the Town of Falmouth to discuss the approach of <br /> developing a regionalized system at the MMR. <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.