Laserfiche WebLink
Board of Selectmen <br /> Minutes <br /> November 79 2011 <br /> DPW Director: <br /> Anne Sand Bid: <br /> It is recommended the Town award the annual sand bid contract to Cape Cod <br /> Aggregates at a cost of$9.49 per ton. The price is reflective of the lowest bidder <br /> representing a 15%decrease from last year. <br /> Motion made by Selectman Richardson to accept the hitt from Cape Cud <br /> Aggregates for the Annual Sand bid as referenced. <br /> Motion seconded by Selectman Sherman. <br /> VOTE: Unanimous. 5-0. <br /> boil Call Vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalane,yes <br /> Selectman O'Hara,yes opposed,none <br /> Request for A. roval—Change Orders Nos. 1 2 —Corolla C nt�ractm- Roof <br /> Projects; <br /> The Board of Selectmen was receipt of several change orders from Corolla <br /> Contracting, Inc. for roof related projects. The net change to the contract is <br /> $1139536.58. It was noted the Planning& Construction Committee has endorsed <br /> all change orders. Funding shall derive from the Capital Improvement bond <br /> approved by a vote ofthe May 2011 Town Meeting. <br /> Change Order#1-. $78,084.00—To replace the seams on the membrane roof at the <br /> Mashpee Middle/High School where the solar panels are being installed. Corolla, <br /> the low bidder shad provide a -year warranty on the roof. <br /> Change Order#2: $24,452.68—To address unforeseen conditions at Town lull, <br /> the Coomb School and the Quashnet School once construction began and to <br /> include changes in the scope to upgrade and/or address addition leak areas. <br /> Change Order#3: $11,000—To repair the leak areas at the Middle/High School <br /> detected by an infrared scan and by visual inspection, <br />