My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/7/2011 BOARD OF SELECTMEN Minutes
>
11/7/2011 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:29:49 PM
Creation date
8/31/2018 11:58:35 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
11/07/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Selectmen <br /> Minutes <br /> November 79 2011 <br /> DPW Director: <br /> Anne Sand Bid: <br /> It is recommended the Town award the annual sand bid contract to Cape Cod <br /> Aggregates at a cost of$9.49 per ton. The price is reflective of the lowest bidder <br /> representing a 15%decrease from last year. <br /> Motion made by Selectman Richardson to accept the hitt from Cape Cud <br /> Aggregates for the Annual Sand bid as referenced. <br /> Motion seconded by Selectman Sherman. <br /> VOTE: Unanimous. 5-0. <br /> boil Call Vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalane,yes <br /> Selectman O'Hara,yes opposed,none <br /> Request for A. roval—Change Orders Nos. 1 2 —Corolla C nt�ractm- Roof <br /> Projects; <br /> The Board of Selectmen was receipt of several change orders from Corolla <br /> Contracting, Inc. for roof related projects. The net change to the contract is <br /> $1139536.58. It was noted the Planning& Construction Committee has endorsed <br /> all change orders. Funding shall derive from the Capital Improvement bond <br /> approved by a vote ofthe May 2011 Town Meeting. <br /> Change Order#1-. $78,084.00—To replace the seams on the membrane roof at the <br /> Mashpee Middle/High School where the solar panels are being installed. Corolla, <br /> the low bidder shad provide a -year warranty on the roof. <br /> Change Order#2: $24,452.68—To address unforeseen conditions at Town lull, <br /> the Coomb School and the Quashnet School once construction began and to <br /> include changes in the scope to upgrade and/or address addition leak areas. <br /> Change Order#3: $11,000—To repair the leak areas at the Middle/High School <br /> detected by an infrared scan and by visual inspection, <br />
The URL can be used to link to this page
Your browser does not support the video tag.