My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/2011 BOARD OF SELECTMEN Minutes
>
12/5/2011 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:30:57 PM
Creation date
8/31/2018 11:59:26 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/05/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Selectmen <br /> Minutes <br /> December 5,2011 <br /> APPOINTMENTS &HEARINGS: <br /> bablic Hearin —Tax Rate Classification: (continued) <br /> With the vote of the Board of Selectmen, the FYI 2 tax rate is$8.51 per$1,000 <br /> valuation. The cost to an average single family hone ire Y 12; $450,397 is <br /> $3,833. The $0.14 increase is due to the Mashpee Library building project. Last <br /> year the rate was $8.37 per$1,000 valuation. <br /> The rate does not include the % CPA Tax; $0.26 per$1,000 valuation. The <br /> CPA rate was $0.25 last ye .r , and the water District Tax $0.19 per$1,000 <br /> valuation. The water District rate was $0.20 last year).- <br /> NEW <br /> ear):NEW BUSINESS- , <br /> Reguest for&pLroval ofChange Orders#4  —Corolla Contracting—Roof <br /> RLolects. <br /> Catherine Laurent, Director of Public Works as present to review the-Chan e <br /> Orders voted b the Planning& Construction Committee for unplanned repair <br /> work associated to the Quashnet School, the Coombs School and the Mashpee <br /> High School. work is anticipated to be completed by Corolla Contracting,the <br /> low bidder for roof replacement and repairs. <br /> Change Order No. 4 is for$3,363 to replace the gas pipe at the Coombs School. <br /> The contract originally specified the re-use of the existing pipe(deemed.in poor <br /> condition). In addition to the upgrade,them is a change %n the project scope to <br /> repair two leak areas detected at the Quashnet School. <br /> Change Order 1 . 5 amounts to $3,800 to repair the lightening protection system <br /> at the Mashpee High School. the repair includes re-securing the cable to the roof <br /> and the roof-mounted mechanical wits. <br /> It was disclosed the use of the existing contractor deemed the low' bidder <br /> represented a cost saving§to the'down alleviating the need to mobilize a neer <br /> f m. All work conforms legally to the open'bid process. <br /> For clarification purposes, Change Order No. 1 approved by the Board at their <br /> November 7th meeting allocated$78,084 to Corolla Contracting to replace the <br /> seams on the roof membranes at the mi dl high school where the sour panels <br /> were being installed. All work is Within budget. Funding shall derive from the <br /> capital bond eararled for infrastructure hproements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.