My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2011 BOARD OF SELECTMEN Minutes
>
12/19/2011 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 12:51:46 PM
Creation date
8/31/2018 12:51:25 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 <br /> Board of Selectmen <br /> Minutes <br /> December 19,2011 <br /> Public Hearing=Application by Richard Cook Jr. Shellfish Grant in Ponnonesset <br /> Bay: (continued) <br /> Motion made by Selectman Cahalan to close the Public Hearing. <br /> Motion seconded by Selectman Richardson. <br /> VOTE: Unanimous. 5-0. <br /> Roll Call Vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalane,yes <br /> Selectman O'Hara,yes Opposed,none <br /> Motion made by Selectman Cahalan to approve the new application filed on <br /> December 5,2011 by Richard J. Cook,Jr. for a 1.9 acre shellfish grant to be <br /> located in Popponesset Bay to include the requirements imposed by the <br /> Waterways Commission in their memorandum of November 22,2011. <br /> Motion seconded by Selectman Richardson. <br /> VOTE: Unanimous. 5-0. <br /> Roll Call Vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cahalan,yes <br /> Selectman O'Hara,yes Opposed,none <br /> Public Hearing—Application of Hatem Enterprises—Change of Underground <br /> Storage: <br /> The Board of Selectmen opened the Public Hearing on the application of Hatem <br /> Enterprises Nominee Trust, 723 Falmouth Road,Mashpee for reconfiguration and <br /> development of the existing gas station on the site. Changes include; removal and <br /> replacement of the existing underground fuel tank(one 15,000 gallon tank, one <br /> 8,000 gallon tank, one 500 gallon tank)and installation of two tanks (one 30,000 <br /> gallon tank and one 10,000 gallon tank); a total increase of 16,500 gallons. <br /> The Hearing notice was read aloud into the record. Attorney Michael Ford, <br /> representing counsel for Hatem Enterprises was in attendance with Bili Taber, <br /> project engineer of Vanasse Hangen Brustlin, Inc. (VHB)to discuss the license <br /> application with the Board of Selectmen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.