My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/2012 BOARD OF SELECTMEN Minutes
>
5/21/2012 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:14:57 PM
Creation date
8/31/2018 1:41:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
05/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Selectmen <br /> Minutes <br /> Ma 2 1, 20 1 2 <br /> NEW BSEgSS: <br /> .ati kation of Easement—Collins Lane: <br /> The Board of Selectmen reviewed the Easement for the Mashpee Baptiste Church, <br /> 27 Great Deck Road Horth entitled Collins Lane as approved by the voters at the <br /> May Town Meeting, <br /> Motion made by Selectman Taylor to ratify the Easement for Collins Lane as <br /> presented. <br /> Motion.seconded by Selectman Cahalane, <br /> VOTE: Unanimous. 5-0, <br /> Roll_ Call vote: <br /> Selectman Taylor,yes Selectman Richardson,yes <br /> Selectman Sherman,yes Selectman Cabalane yes <br /> Selectman O'Hara,yes opposed, none <br /> APPOINTMENTS &HEARINGS. <br /> Pubic eaudn —Private to Flublie Conversion of Holly Way, In Lam <br /> AutPoombeam Lane,,Lantern <br /> vrr <br /> Lane, Beechwood wive, Hemlock eve,Fir Court: <br /> �.i <br /> The Board of Selectmen opened the Public Hearing to consider the adoption of <br /> proposed Ton road layout of Holly Way,Elm Lane,Atwn eve, Attaquin <br /> Street, Poc .nomet Sbwt, Hornbeam Lane, Lantern fie, Beechwood Drive, <br /> Hemlock Drive, Fir Court. <br /> The Hag notice was read aloud into the record. It was disclosed the total cost <br /> of the betterment i $865,749,50,and the maximum cost to be borne by 69 <br /> property owners is$12,547.09. The cost can be paid by the homeowner or it may <br /> be spread over a 20 year period. <br /> It was disclosed the Town is moving forward with the process as part of the <br /> Santuit Fond Restoration project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.