My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1995 BOARD OF SELECTMEN Minutes
>
12/18/1995 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:10:19 PM
Creation date
9/13/2018 11:50:01 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/18/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r ' <br /> t <br /> Change O <br /> OWNER [x] <br /> AIA Document G701 - Electronic Format ARCHITECT [x <br /> CONTRACTOR [x <br /> FIELD [ <br /> OTHER [ ] <br /> PROJECT: CHANGE ORDER NUMBER: 005 <br /> (name, address) <br /> Mashvee Hiah School y <br /> Mashpee;MA <br /> DATE: December 04, 190,q <br /> TO CONTRACTOR: ARCHITECT'S PROJECT NO: 94023 <br /> (name, address) CONTRACT <br /> The Stone BuildingCompanyDATE. Ma 8 1995 <br /> 78o Allens Avenue CONTRACT FOR: General Construction <br /> Providence, RI 02905 <br /> The Contract is changed as follows: <br /> 1. Add conduit stub-out for future outdoor athletic_Iightffig per Change Estimate 015 dated 14119/95. <br /> 2. Add additional clearing for locating excess loampile,,- er'Chan a Estimate 016 dated 10/26195. <br /> 3.Credit for use of reclaimed p avement materials as p avin sub radinZ per Chan a Estimate 017 dated 11101.1 <br /> 95. <br /> 4. Add Floor Drain at Laundry Roomper Change Estimate 018 dated 11110195. <br /> Not valid until signed by the owner, Architect and Contractor. <br /> The original (Contract Sum) was <br /> $1820 000.00 <br /> Net change by previously authorized Change orders $161,440.00 <br /> The(Contract Sum)(.aur-aateed-Maxizn urn primo} <br /> prior to this Change Order was $1.8,251,440.00 <br /> The (Contract Sum)Ctaewill be <br /> (increased) by this Change Order in the amount of $1 834.00 <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA DOCUMENT G70I-CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W., <br /> WASHINGTON,D.C.,70006-5292.WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This document was electronically produced under <br /> license number 796001239 and can be reproduced without violation until 7127196. <br /> Electronic Document Service G701-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.