My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1995 BOARD OF SELECTMEN Minutes
>
12/18/1995 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:10:19 PM
Creation date
9/13/2018 11:50:01 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/18/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Change - OrderOWNERCxj <br /> AIA Document G701 - Electronic Format ARCHITECT <br /> CONTRACTOR [x� <br /> FIELD Cx I <br /> OTHER [ ] <br /> PROJECT: CHANCE ORDER NUMBER: 007 <br /> (name. address) <br /> MashRee High School . <br /> DATE: December 07, 1995 <br /> Mash et MA <br /> TO <br /> CONTRACTOR. <br /> (name, address) ARCHITECT'S PROJECT NO: 94023 <br /> The Stone Suilding Company-CONTRACT DATE: May S,-1995 <br /> 7$0 Allens Avenue - <br /> Providence, R1 02905 CONTRACT FOR: General Construction <br /> The Contract is changed as follows. <br /> X, I.Upgrade roadway curbing from concrete to . ranite at buildinsentrance, per Change Estimate Od. datd 11/—e <br /> 10/95. *Removed from change order. <br /> 2. Add horizontal bonds to o€'fices and blackout shades to classrooms., er.Change Esti3mate 06.9, dated 11/10195. <br /> 3.Add wood p1nelin&to the Auditorium oroscenium, per Change Estimate 023.dated 11115195. <br /> r <br /> mow^^ <br /> Not valid until signed by the Owner, Architect and Contractor. <br /> The original (Contract Sum) a was $18,0904000.00 <br /> Net change by previously authorized Change Orders $218..361.00 <br /> The (Contract Sum) -ua <br /> prior to this Change Order was $18 308 361.00. <br /> The(Contract S um)(QuaF a will be <br /> �it:creased)(de�r �} A d�by this Change Order in the amount of $46080-00 <br /> *Revised: $27,643 .00 <br /> THIS DOCUk%►tSNT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAPTED AIA DOCUMENT MAY BE MAGE BY USING AIA DOCUMENT D401. ' <br /> M• r - moi. <br /> AtA DOCUMENT G701-CHANCE ORDER- 19$7 EAtTj()N-AIA•COPYRIGHT 1997-THE AMERtCAN INSTITUTE GP ARCHITECTS. (731 NEW YORK AVENUE.N.W.- <br /> WASHINGTQN.D.0.200444242,WARNING:UriGcc�cd pholocopying viotatis U.S.copyright laws and i%subject to legal prosecution.This ducume4l was electrOni""Y produced Uadet <br /> IiaMu number 7960012;9+►nd.can he tegradeKrd,rithonr viotatian until 712710b, <br /> Electronic Document Service Cr70 1.-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.