Laserfiche WebLink
Page 8 <br /> Board of Selectmen <br /> Minutes <br /> January 9, 1995 <br /> r DPW Director re: Future Road Projects: <br /> Greg Taylor was present to discuss future road and bikewayprojects <br /> usE� with the Board. <br /> A list of projects required to maximize the_cost benefit of maintenance <br /> funds and to provide an extension of the bikeway/walkway network <br /> were discussed in addition to budgetary estimates for construction. <br /> ,a <br /> Mr. Taylor recommended to set aside the sum of$50,000 to complete <br /> _= necessary engineering studies to attain additional grant funding. <br /> S� <br /> A Roadway Management Stud for the Town of Mashpee will be resented <br /> y p p <br /> to the Board for consideration next month. <br /> Consensus of the Board to authorize the DPW Director to compile a <br /> rr recommended list of priority projects for the Board's review. <br /> rry <br /> Future agenda topic of discussion. <br /> DPW Director re: Cape Drive Drainage: <br /> iY=^ <br /> ]lit <br /> ,yr <br /> r' Mr. Taylor provided an estimate to air two catch basins at the base of <br /> y � repair <br /> }n: Cape Drive to correct the drainage problem occurring near Sampson's <br /> � g P <br /> Mill Road. <br /> The repair is estimated to cost$3,500. Funds are currently-.; y available <br /> in the Private Roads Account. If approved b the Board construction <br /> .:� PP y <br /> �..` will commence in late March or early April as weather dictates. <br /> Motion made by Selectman Costa to approve the Cape Drive <br /> drainage repair near Sampson's Mill Road as presented. <br /> Motion seconded by Selectman Caffyn. <br /> VOTE: Unanimous. 5-0. <br /> s <br /> Town Planner re: Comprehensive Plan. <br /> t <br /> Comprehensive Plan with <br /> Tom Fudala was present to discuss the Local Com <br /> :;. P <br /> Fthe Board. He recommended that the Board give input to all fifteen <br /> x <br /> elements of the LCP. <br /> At this time,approximately 25% of the Comprehensive Plan is complete <br /> completion <br /> informed Mr.Fudala. It was noted that he is committed to the com <br /> 1- P <br /> `- deadline of January 1, 1997. <br /> -'F1 <br /> r}3 <br /> 1Z <br /> al. <br /> Mr.Fudala requested the Board give particular attention to the Municipal <br /> P <br /> Buildings and Facilities and the School Facilities elements of the Local <br /> Comprehensive Plan. <br /> :'S.. <br />