Laserfiche WebLink
Board of Selectmen <br /> Minutes <br /> February 6, 1995 <br /> Page 1. <br /> Present: Selectman Mills, Selectman Costa, Selectman Caffyn,Selectman Dinizio <br /> xf Executive Secretary Robert Whritenour <br /> "'- Absent: Selectman Vaccaro <br /> Meeting Called to order by Chairman Mills at 6:00 p.m. <br /> JR/SR HIGH SQHQ0L• <br /> i. <br /> Architectural Update: <br /> J 1j11. <br /> Symmes,Maine and McKee,the selected architectural firm for the Mashpee <br /> f <br /> high school project was present to update the Board with respect to updated <br /> } architectural renderings of the project proposal. <br /> N The four A's of the architectural plan were resented for the Board's <br /> P p <br /> r{. . <br /> review. The A s include; athletics, academics,arts and strative <br /> aspects of the architectural plan to meet Mash e's educational needs. <br /> -Y It was noted that it is SMMA s intent to design the bu ng in character <br /> r <br /> with the uniqueness of Cape Cod.. <br /> q p <br /> Selectman Caff <br /> .tyn presented several concerns addressed by Gregory Taylor <br /> for additional consideration. It is the Board's intent to obtain a response <br /> from the High School Building Committee to further address Mr. Taylor's <br /> concerns. <br /> ` <br /> *Agenda Item. <br /> _ g <br /> . NTS AND BEARINGS: <br /> Po l <br /> 'r:c'3firca. <br /> Ta d h g <br /> Sweeney - Preliminary Town Hall Space Needs Report: <br /> ` Donham and Sweeney representative,Tadhg Sweeney was present to <br /> :. <br /> 0A discuss the relits of the Town Hall Space NB <br /> eds Report <br /> with the Board of Selectmen. <br /> s3�a rf <br /> It was noted that input to the future renovation of the Town Hall facility <br /> was submitted by Department Heads for additional space considerations. <br /> ,Mp <br /> Mr. Sweeney indicated that input received from the Department Heads <br /> will be incorporated into the final draft proposal <br /> '•.:._TLTi <br /> L Schematic renderings will be available for the Board's review on <br /> February 21, 1995. The Board directed Mr. Sweeneyto submit sua separate <br /> proposal relative to the installation and/or upgrade of a new heating system <br /> P�' g Yste <br /> Mr.Whritenour indicated that theP <br /> as tan resented is economical and <br /> P <br /> efficient to meet the 20 year needs of the Town. It was noted that the plan <br /> . . . <br /> provides for additional office space needs for the future of Mashpee. <br />