Laserfiche WebLink
r <br /> " P.O. Box 15 3 <br /> 1 Mashpee, Massachusetts 02848 <br /> Telephone 508-477-6767 <br /> Fax 508-539-0382 <br /> `'for generations unborn" <br /> April 10, 1995 <br /> 1 <br /> r <br /> Judy Mills, Chairman <br /> Board of Selectmen <br /> 16 Creat Neck Road North <br /> Mashpee, MA 02649 <br /> Re: ZONE II/WELLS 2 AND 3 <br /> Dear Chairman Mills and Board Members : <br /> The Board of water commissioners offer the following <br /> g <br /> recommendations for consideration and inclusion to the <br /> "Agreement Modifying Restriction's between the Town of Mashpee <br /> and Christopher Burden, Trustee of New Seabury Great Flat <br /> Pond Nominee Trust : <br /> 1. All new sewers and house connections shall be <br /> constructed using ductile iron pipe with mechanical joints in <br /> order to prevent exf it tration. All sewers to be pressure <br /> tested. dor <br /> C\)�N) <br /> 2 . All construction, with the exception of existing <br /> structures, shall be connected to a sewage treatment facility <br /> before the total combined sewage flow from new construction <br /> reaches 15, 000 gallons/dojTotal flow to be c puted by the <br /> tow <br /> n s Board of Health, utilizing Title 5 . ?e4 &") <br /> 3 • No sewage treatment facilities will be allowed, within <br /> Zone II of wells #2 and #3 . <br /> 4• Treatment facilities and pumping stations shall be under <br /> the continuous supervision of an appropriately licensed <br /> ` r <br /> Operator. <br /> -� <br /> Y&� � a <br /> • A system of monitoring wells shall be installed0-001, <br /> immediately down gradient or upgradient of Zone II and wells <br /> #2 and #3 . The cost of drawing and laboratory examination of <br /> quarterly samples shall be borne by the New Seabury Company <br />