My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/24/1995 BOARD OF SELECTMEN Minutes
>
7/24/1995 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:07:34 PM
Creation date
9/13/2018 2:36:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
07/24/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MainiNicXee �- - - <br /> Associates, Inc. <br /> The following listing defines the additions to the construction contract accepted <br /> by the Building Committee on 6127195 <br /> Italicized items are not accepted or require further review prior to descision <br /> Underlined items are accepted <br /> L SITE <br /> _L Add one_softbalI field for total of two . <br /> 2 Add one baseball field For total of two <br /> �.rrr.i�nmr <br /> Add the practice f t alI field <br /> 4 .odd clearing and fill for future fields <br /> 5.i <br /> Add a ba5ketball court total o ttiv <br /> Ung—rade track surface to synthetic from a haI 'c - <br /> 7 Add stadium & tennis&basketball court 1;Ming <br /> $ <br /> Add three." ,h�.,_ tennis courts& fendfflr,a total-of sib <br /> 9 Add I00 parking spaces(400 parking spaces to be provided) <br /> 10 Change screened bituminous paving to concrete paving in courtyard <br /> U Add irri crati n system to the added olav gelds <br /> .r? Add ite accessories enches.bike racks trash receptacles..water fountains) <br /> dd 4?o if of 5'concrete ide%valk between the I cker room and stadium <br /> J4 Increase planting materials <br /> 13 Increase stadhim bleacher seating to 1200 seat <br /> 16 Upgrade Academic Courtyard landscaping <br /> H. BUILDING <br /> 1. Add wood panels at Auditorium entry and oortion of Auditorium idewalI <br /> 7 Add venetian min i-bI inds to a I I off ces and Wack ut shades to al cl sroom <br /> 3 Add one operable wall in Alternate Education for total of two <br /> 4 Upgrade mound,floor eorrLdorffoor finish,from„VCT <br /> 5 Add dual-fuel system for the water heaters and the Treating boilers re. <br /> Add automatic electronic flush valves at the urinals and toilets <br /> - <br /> 7 add automatic electronic._faucets_at the_lavatories <br /> , <br /> $ Upgnmde Iight ixtures from lensed fixtures to deeMparabglic fixtures <br /> ade Auditorium seat cushions_LQ u h l tered from- <br /> 10 <br /> r m10 Kidd operable wall between Auxiliary Gym and Gym <br /> I I dd as -thru heated and refriggerated cabinets and ice maker!Q kitchen, <br /> 12 Add motion sensor switches for light fixtures in classrooms r <br /> 13 Add Skylight over Gallery Corridor <br /> 14 Add footin Q between Aux Gvm and Gvm <br /> F <br /> B <br /> Total <br /> ,. . 1 4 <br /> Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.