My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
>
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 5:01:56 PM
Creation date
11/14/2018 2:37:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
02/05/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8 <br /> Capital hnprovement 1 rogrm Committm <br /> Minutes <br /> February 5, 2013 <br /> PLYING&CONSTRUCTION: (continued) <br /> DPW—SLoMe Garage&Parkin rovements -$500,000: <br /> An ongoing request of the DPW is a storage building to house vehicles and <br /> equipment. Presently all vehicles and equipment are stored outdoors and exposed <br /> to a variety of weather conditions. A o'x 100' metal building is proposed at a <br /> cost of$100,000. The building would not be heated or occupied. <br /> Discussion followed with respect to the use of chapter 90 funding permissible for <br /> this type of expenditure. <br /> Included in the $500,000 capital budget proposed for the DPW is a$85,000 <br /> vehicle and equipment wash facility. The gashing of vehicles is now conducted <br /> with the use of an old fire hose with wastewater draining into a leach pit. The <br /> remainder of the funding would support parking lot improvements,resurfacing <br /> and drainage systems. <br /> Quashnet School.Parking Lot.Reconstruction-$500,QOO: <br /> The sun of$500,000 is proposed in FYI 4 to reconstruct the paring lot and bus <br /> drop off at the Quashnet School. The site has pavement settling, significant <br /> cracking and insufficient drainage. Accessibility i nprovements and provisions <br /> for student drop,off and pick-up are in need of addressing in this project. <br /> SCHOOLS: <br /> Wireless *ice- 1o. 00)LqK#1 of 3 Year Pro <br /> �. <br /> ��iraaq+rt++ ^I I I I <br /> The School's Network Administrator Sean money was in attendance to discuss. <br /> the capital needs of the School Department. Mr. Maloney,priori <br />
The URL can be used to link to this page
Your browser does not support the video tag.