My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/16/2014 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
09/16/2014 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 5:07:34 PM
Creation date
11/21/2018 2:26:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Com aunity preservation Committee <br /> Minutes <br /> September 16, 2014 <br /> APPOINTMENTS & HEARINGS: <br /> Catherine Laurent--1 pdate on Town CPC Prof t : <br /> �F+.+�+ <br /> Catherine Laurent, Director of Public works,net with members of the <br /> Corm unity Preservation Cottee to review the status of CPC funded projects <br /> that have benefited the Town of Mashpee. <br /> Mash ee Archives; <br /> The CPC project to preserve and restore the Mashpee Archives is approximately <br /> %complete. To conform to budgetary constraints most of the work with the <br /> exception of HVAC and plumbing has been conducted by the Mashpee <br /> Department of public Works. This includes interior site work, exterior plantings, <br /> retaining wall and walkway. All funds associated to the $240,000 budget have <br /> been committed. To complete the project and to confonn to handicap <br /> accessibility requirements for public access, a railing for the walkway will be <br /> installed within the next few weeks. The project is slightly over budget. <br /> Addition funds would be assumed by the DPW building and grounds budget. <br /> With the completion of the Mashpee Archives project,the DPW will coordinate <br /> the moving of the Town's documents and other displays with the Mashpee <br /> Historical Conm sion. A ribbon cutting ceremony is planned, and the date will <br /> soon be announced. <br /> Co m fty Eark.Restoration tion p <br /> CPC funding will re-establish the Community Park as the center of the Town of <br /> Mashpee.�The park connects to the Mashpee Archives, Veterans Garden and One <br /> Room Schoolhouse. The Town plans to hold weekly concerts, fairs, and <br /> recreational events at the site location. The $350,000 project will include a <br /> pavilion,and is anticipated to be completed in the Spring of 2015. <br /> Included in the budget is the balance of the $5,818 CPA appropriation from the <br /> Schoolhouse renovation for work related to this prof c . The DPW Director is <br /> expected to work with Mr. ford representing Schoolhouse Committee on the <br /> allocation of said funding. Interpretive'signage,plantings and a small shed are <br /> Planned. <br /> It was agreed that CPC signage would be displayed at each project funded b y the r <br /> �gp y <br /> Community Preservation Committee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.