Laserfiche WebLink
Con nunity preservation Con nittee <br /> Minutes <br /> September.16, 201 <br /> AEPQINLNffNTS&HE �fi S: <br /> �l <br /> Qatherine Laurent—U to on Town CPC_Pro#elm <br /> Great Rier Boat RMUpdate: (continued) <br /> It was agreed the parking area would be v6den d for ease of flow and be <br /> lengthened to accommodate the additional trailer parking. Catch basins are <br /> proposed in the grassed islands to capture storm run-off. <br /> Ms. Laurent indicat d the Board of Selectmen has voted in support of the plan. <br /> meeting is scheduled with the Conservation Commission next month to review <br /> the proposal. with appropriate permits and weather conditions,the project <br /> construction is anticipated begin in late October. <br /> Boys girl Club..—,Qu_.Ldogr BgEketball Court: <br /> The,DPW has been assisting the Boys&Girls Club in the replacement of the <br /> bwkboards and related padding at the outdoor basketball court,. It was noted the <br /> $17,,800project esfimte included crag sealer the court. However,there was no <br /> guarantee that it would last for more than one-year. It was noted the eoW is <br /> x. npaxred by tree roots and settlement from decomposition,and here is cracking <br /> around the basketball hoop areas. As a result,the DPW is moving forward t <br /> obtain a second opinion on the repair. <br /> pickerel Cve_: <br /> In October of 2011 CPC funding provided W,160 for the recreation of a 2 acre <br /> open recreation field,the construction of a secondary parking area for six <br /> vehicles,and the establishment of a car-top boat access for canoes and kayaks <br /> with a drop-off at the Pickerel Cove Recreation Area on Mas pee Wak by Fond. <br /> All work is intended to comply with the Ind Management Agreement by and <br /> between the Town of I lashpee and Department of Fish&Game. <br /> The unused funds, $43,087 were to be used to construct a new entrance and <br /> parking lot on the property for a proposed canoe/kayak ramp, ft is a State <br /> requirement to construct a handicap accessible rmp. A a result f topography <br /> leading to the pond, it is cost prohibitive and there is no design t M <br /> satisfy the ate <br /> requn-ements. Ms. Laurent indicated the Town Will not be completing the project <br /> as outs fined. Additional options are being considered by the Town for future CFC <br /> funding. <br />