Laserfiche WebLink
fM i <br /> o wn, <br /> Conservation Commission <br /> Thursday, February 14, 2013 <br /> [aahpee Town Hall -Conference Room 2 <br /> Call Meetina To order: <br /> PRE/POST-HEARING AGENDA: <br /> + Minutes: January 31, 2013 <br /> 0 Revised Plans- Mullen 188 Pimlico Pored Road 043-2721 <br /> • AFCEE Proposed FS-1 Groundwater Il onitorin l lI (permit or no-permit?) <br /> • Re ue t By Mark Gurnee to Have Funding For MACC Conference: New acct set up; Prof. <br /> Development -1 OIC-rolling acct from state wetland fees) <br /> • <br /> 29 Frog Pond Close: Enforcement Order- unauthorized clearing of vegetation/topping trees on a <br /> coastal bank. Recommendations of certified Arborist (Allen) <br /> EO 2h New Seatbury to be reviewed and signed by commissioners <br /> USGS Proposed Research on Surface/Groundw ter Studies on Q u as hnet River o rres ponder ce <br /> sent to commissioners) <br /> Land Stewardship Updates: Guest lecturers, Santult Pond Preserve, Americorps Week <br /> HEARINGS <br /> 6:00 Erin & Al G g lin (75 l lonoahan ett Roads Upgrade septic system to Title V. RDA <br /> Existing cesspool shall be pumped, filled and abandoned. <br /> 6:03 Maush p Village Trust *-"'043-2533*,* (358 Shore Drive) Revise the time restriction AOC <br /> f beach nourishment from April 1s'to June 30th <br /> 6:06 Brad Sweet (13 AmyBrom Road) Remove three large Locust trees that are RDA <br /> hazardous to dwelling and prune some front yard ornamental trees,9"Cori tinued <br /> �rom Jac �y , - 32013*- <br /> 6:09 James G mes Timberlane Drive) Replace existing wooden dock with an RDA <br /> aluminum:dock in the same foot print <br /> 6:12 Jeffrey & Sheila Eydenberg (16 Squaws Lane) Demo / Rebuild and new Title 11 Noll <br /> Septic <br /> 6:15 Mark & Sally Goggin (24 Taffrail Way) Install 130 linear feet of timber retaining wall Nol <br /> along the edge of lawn <br /> 6:18 Gregory & Elizabeth Stento (155 Popponeet island Road) 227 Linear feet of 9 fol <br /> timber retaining wall along the edge of lawn <br /> 6:21 Stuart McLeod Secosrisett Point Rad Rebuild darnaged,-,;roffing buikhead wall In <br /> the same foot W WI H AWN 113 1113 'Weed e-heara o, <br /> not ° :' ��� #� e �*� ����� o� January �I UVB CLERK <br /> p� <br /> FEB 3 2013 <br /> RECEIVED BY4- <br />