Laserfiche WebLink
6:06 Sara Zobel (4 BroomstickWay) create a vista corridor with maintenance in perpetuity - N01 <br /> Resource Area: Inland Bank, Buffer Zone to Freshwater Wetland (Abandoned Bog) <br /> Material submitted: Proposed septic system Upgrade (vista hand drawn) 3127113 Patriot Landscape <br /> riche <br /> fg:381-Wayne Tavares from Wet Tech Land Design is representing the applicant and explains that the <br /> property frontage i ' so he calculated 25% of that which is 17' gide at the edge of the resource area <br /> and at the deck will be 13.Or. <br /> Diction made, seconded and unanimously carried to close and Issue <br /> 6:09 Michelle Greenfield, Trustee on behalf of 91 Greenfield children's Trust (27 feelWay) Delineate, <br /> prune and maintain a vista corridor and an expansion of a previously approved patio/walkway area <br /> which will include required mitigation plantings- Ii i> , i i arch (, . 3** <br /> Resource Area: Coastal Bark, LSCSF, BVW, Buffer to Coastal Beach <br /> Material submitted: Vista Pruning Plan & Other Modifications 3129113 Wet Tech Lard Design <br /> (12:03] Wayne Tavares from.Wet Tech Land Design is representing the applicant. Mr. Tavares states that <br /> the vista corridor has been re-delineated and the width is now 360.97' which is 25% of the frontage. Agent <br /> McManus states that he confirmed the staking is accurate. Mr. Gurnee asks if any trees will be moved <br /> and the agent says it will be limited pruning of mature trees and no tree removals. <br /> Motion imade, seconded and unanimously carried to close and Issue <br /> 6: 12 Ana Ferris sec nsett Point Road) Demolish the existing two-car garage and rebuild a smaller <br /> one-car garage in different location - AOC <br /> Resource Area; LSCSF, Buffer Zone to BVW, salt Marsh <br /> Material submitted, Plot Plan of Lard 413113 Cape & Islands Engineering <br /> 114,,39] John Slavinski from cape & Islands Engineering is representing the homeowner and states that <br /> they will remove the existing garage and construct a new garage that is 19% smaller on the other side of <br /> the lot. Mr. Slavinski states that it will be more than 100' farther away from the B II but still in the flood <br /> zone. Agent McManus states that the erosion control will need to be put back in place in the rear of the <br /> property. <br /> Susan Howard, an mutter, states that the new garage being proposed is a non-conforming use. M . <br /> Howard states that her concern is the extent of development on the site. Ms. Howard shows the Burd <br /> some photos that she had brought. She states that she has three concerns; the fiat concern is that she i <br /> asking the Ferris's to respect their boundaries as there are cobbles stones in front of the existing garage <br /> that come out beyond their boundary line. M . Howard also requests that the garage net be any bigger in <br /> volume and that the driveway pian be viable. M . Howard also asks if the driveway can be permeable; are <br /> thea any trees being removed; and if the will be any changes to the septic system. <br /> John Slavinski, from cape and Islands Engineering, starter that the ZBA has approved the plan and the <br /> relocation of the garage was filed as a "Finding of Fact". Mr. Slavinski states that the road is a private <br /> road and they can place cobble stone on it if they would like; they just can't block it. Agent McManus says <br /> that he feels M . Howard's concerns are more of ar Zoning purview and not Conservation as the main <br /> focus for conservation is the impact to any resource areas. The agent starter that there is no adverse <br /> impact to the bordering vegetated wetland and saltmarsh. <br /> Lotion made, seconded and unanimously carried to approve the Amended orders as presented <br /> pending the approval of the Zoning Board of Appeals <br /> 2 <br />