My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/2013 CONSERVATION COMMISSION Minutes
>
7/25/2013 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 5:06:07 PM
Creation date
11/21/2018 2:46:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> through decking to build on top,of the path to eliminate the scouring from the foot traffic. <br /> Mr. Burtis said he installation of another set of stairs would eliminate foot traffic and the <br /> all the vegetation to regenerate. <br /> Agent McManus stated this is a straightforward application to eliminate foot tramping <br /> through the marsh. He said that the flow through decking which allows % sunlight <br /> through the material should promote regeneration of the vegetation. - The material is <br /> plastic composite with holes in it. The Harbormaster is fine with it because it doesn't go <br /> over water. <br /> No comment from the public. <br /> Motion made, seconded and unanimously voted for a Negative Determination <br /> 6:09- Burton M. Sack, Trustee, 37 Shoestring Bay Road. Remove two existing;pipes <br /> and replace with installation of two 1211 diameter pings within same footprint, <br /> RDA <br /> Resource Area; Land'Under Ocean, LSCSF <br /> F <br /> Material Submitted: 37 Shoe tr cy Bay'Road <br /> Mark Burtis, Little Raver Boatyard, represented Mr. Sack. Mr. Burtis stated that Mr. <br /> Sack has been through several of these pipes and it is not an effective way of holding the <br /> dock. A piling would ensure the dock would stay in place. <br /> .Agent-McManus stated that it is standard procedure to replace metal pipes with 12" <br /> diameter wood piles in the same footprint in order to secure the piles in place so they <br /> don't become stone water debris. No other charges are proposed. <br /> No comments from the public. <br /> Mtion made and seconded and unanimously carried for a Negative Determination. <br /> 6:12 Robert I and Jennifer Monteith,, 19 Manitoba Road. Pump and U existing <br /> septic system and upgrade with installation of new gravity fed Title v septic system. <br /> RDA <br /> Resource Area: Land S ed-to Coastal Storm Flow, LSCSF <br /> Materials Submitted: 19 Manitoba Road <br /> Peter McEntee was represented the i lonteith's. A new Title V septic system will re .lace <br /> the existing 30 year old tank. He said for the record they are in the B Zone not the A and <br /> will submit a corrected plan. <br /> Agent McManus read a letter from the Board of Health approving the plan on July 10 for <br /> a Title V Septic System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.