Laserfiche WebLink
1 <br /> he had a meeting with Geoff Spillane (Mashpee Enterprise) who will publish ars article <br /> about the importance of conservation land, the reason for the gates and why they are so <br /> important. Hopefully, this will get the word out there. He noted this is the only.gate that <br /> is set back from the main road and may have been targeted because of its location. The <br /> other gates are rear the main roads where there is constant flow of traffic or residences <br /> across the street. <br /> HEARINGS <br /> :oo New Seal ury Colony villa Condominium Owners, 90 Shore Drive west. <br /> Proposed seasonal platform and access stairs to beach. Continued from 8/22/2013 at <br /> request of applicant. NI <br /> Resource Area: Coastal Bank :znd U"nder an*'Na ituck t <br /> Material Submitted: 90 Sh r : .SAI e West <br /> Michael orselli, lrnouth engineering, Inc. represented the Ne Scabury colony villa <br /> Condominium owners, He explained that Colony villas is seeking permission to install <br /> seasonal access stairs and a platform as shown on the plan. The proposed work involves <br /> construction within the land under the oceans Nantucket Sound. <br /> The site is currently occupied by a residential condominium development, rip rap and <br /> -surrounding lawn and landscaped areas. A paved driveway provides access to the <br /> development. Mr. Borselli said the residents have to climb over rocks to access the <br /> water and it is unsafe. It is difficult to get to the water so an application was filed to build <br /> a seasonal structure that would allow them to get over the rocks, down the stairs onto the <br /> beach/into the water. Most of the time them is standing water but walking into the water <br /> would rake access much easier and safer. He said he advised the residents that anything <br /> installed there would meed to be seasonal. The structure would most likely be aluminum <br /> or wood and fastened to the rocks by drilling Boles and applying epoxy resin to connect <br /> the rocks which would allow the sections to be bolted and thea removed at the end of the <br /> season. Mr. Borselli said there is a possibility they might put in an auger at the foot of the <br /> stairs. All ofthe work would be done by hand., <br /> Agent. McManus said that the Order ofConditi.oris should include protocol calling for <br /> removal of the access stairs from the water prior to a storm event and inclement weather. <br /> There was a discussion,, regarding the removal of the stairs and the safety of the stairs. <br /> The plan is to be able to remove the stairs manually. <br /> No comments from the public. <br /> Motion made, seconded and unanimously carried to Close and Issue 4 <br />