My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/26/2013 CONSERVATION COMMISSION Minutes
>
9/26/2013 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 5:07:35 PM
Creation date
11/21/2018 2:50:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
} <br /> i <br /> 16 Great wreck Vpad ori <br /> Alastipee,Massachusetts 9. 649 <br /> Conservation commission <br /> Thursday, September 26, 2013 <br /> I aquoit Meeting Room - Mashpee Town Hall <br /> CALL MEETING To ORDER: 5:55 p.m. <br /> P I EIPOST-H EAF I N G AGENDA: <br /> 0 Minutes: Approval of meeting minutes: August 22, 2013 <br /> 0 Administrative Approval: 138 Waterway (installation of pool within existing patio layout) <br /> David G. Sharpe Conservation land sign upgrade <br /> HEARINGS <br /> 6:00 Patricia A. eowhi , 3 Bight Circle. Proposed installation of vinyl sheet bulkhead N01 <br /> landward of the coastal bank bordering Popponesse Creek. <br /> 6:03 Robert o, and Caren A. Nahi ian, 12 wheeler Fuad. Proposed installation of gas line ICDA <br /> by National Grid. <br /> 6:06 Bayswater seaside ll LLC, 108 shore Drive West. Proposed construction of vinyl ICDA <br /> fence on property line. <br /> 6:09 David P.. Twomey, 34 spoondrift Way. Proposed construction of a retaining wall to ICDA <br /> minimize a erosion. <br /> 6:12 Peter and Linda c nnly, 172 Waterway. Rebuild fined pier and floatation dock with RDA <br /> gangway within the salve footprint. <br /> 6:15 Robert J.V. and Donna Roche, 6 Great Fiver Road. Rebuild bulkhead wall within the RDA <br /> same footprint. <br /> 6:18 Jeanne C. Mantel, Trustee, 8 Great River Toad, Rebuild bulkhead wall within the RDA <br /> same footprint. <br /> :21 Brian J. and Dawnmarie Jadul, 25 ocean Bluff Drive. Proposed construction of pool N01 <br /> and deck as well ars an elevated walkway to provide beach access. <br /> 6:24 Alfred J. Clemens, 58 spoondrift Way. Project substantially completed in compliance eoe <br /> with plan of record with following changes: minor variation of patio landing and star, <br /> installation of an irrigation system and lawn. <br /> 6.27 Bank of NY Mellon Trust Co., 243 Redbrook Fuad. Project suMWl �&oW�aCLEWc <br /> in compliance with plan of record. Property is in foreclosure and unoccupied. <br /> r SEP 2 4 2013 <br /> RECEIVED BY-.. � .. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.